My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: Workshop-City Hall Complex
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 09/26/07 Work Session
>
Item A: Workshop-City Hall Complex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:10:54 PM
Creation date
9/21/2007 11:55:25 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Work Session
CMO_Meeting_Date
9/26/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Parking for fleet vehicles was included in all options. Parking for personally owned vehicles <br />(POVs) were priced separately and is shown as an additive option. <br />Cost Summary (in millions) <br />Option 1, downtown 1 story building on ½ block with underground (UG) parking $33.5 M <br />Option 2, downtown 2 story building on ½ block with above-ground structured prkg $31.3 M <br />Option 3, out of downtown 1 story building and above-ground structured parking $30.4 M <br />Option 4, out of downtown 1 story building and surface parking $26.6 M <br />Option 5, 2 story building adjacent to City Hall and UG parking $32.9 M <br />Option 6, 2 story building with some City Hall functions above and UG parking $37.3 M <br /> <br />Parking for Personally Owned Vehicles (POV’s) <br />Additive alternate for above-ground structured parking $10.0 M <br />Additive alternate for surface parking $4.1 M <br /> <br />Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.