My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: Crest Drive Street Design Recommendations
COE
>
City of Eugene
>
Council Agendas 2008
>
CC Agenda - 01/23/08 Work Session
>
Item B: Crest Drive Street Design Recommendations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:12:19 PM
Creation date
1/17/2008 5:02:17 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
1/23/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ATTACHMENT D <br /> <br /> <br /> <br /> <br /> <br /> <br />Public Works <br />Engineering <br /> <br /> <br />City of Eugene <br />M <br />858 Pearl Street <br />EMORANDUM <br />Eugene, Oregon <br />97401 <br />(541) 682-5291 <br />(541) 682-5032 FAX <br /> <br /> Date: <br />January 15, 2008 <br /> <br /> To: <br />Mayor Piercy and City Council <br /> <br />From: <br />Mark Schoening, 682-5243 <br /> City Engineer, Public Works Engineering <br /> <br /> <br />Subject: <br />Financial Plan for Funding Improvements to Crest Drive, Friendly Street and Storey <br />Boulevard <br /> <br />Capital Cost <br /> <br />The total estimated capital cost to implement the conceptual design recommended by the Crest Drive <br />Community Team (CDCT) is $5,750,000. Approximately $2,600,000 is assessable to properties <br />abutting Crest Drive, Storey Boulevard and Friendly Street. The Morse Ranch owned by the City will <br />have an estimated assessment of $238,000. Approximately $3,150,000 of the total cost is non- <br />assessable and will be funded by the City. Of the $3,150,000 non-assessable cost, $1,650,000 is for <br />street improvements and $1,500,000 is for storm drainage (conveyance and water quality) <br />improvements. <br /> <br />Operation and Maintenance Cost <br /> <br />Even as unimproved streets, Crest Drive, Storey Boulevard and Friendly Street receive routine <br />maintenance including pot-hole patching, striping, traffic sign installation and replacement, snow <br />removal, inlet cleaning and intersection illumination. Once the streets are improved they will be added to <br />the City’s pavement management system and included in the inventory of improved streets for future <br />capital preservation. <br /> <br />The most significant new cost associated with operation and maintenance is the labor, equipment and <br />materials needed to maintain seven new medians, two new traffic circles and approximately 4,000 linear <br />feet of water quality swales. The incremental increase in annual operation and maintenance of these <br />facilities is estimated at $45,000. This cost will be incurred annually upon the completion of <br />construction in FY10. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.