Laserfiche WebLink
<br />mately 1.6% for electric customers and 8.7% for water customers) or approximately $52 per year, for an <br />average residential customer. Credit from any sale of riverfront property downtown will reduce these <br />amounts. <br /> <br />Actual rate increases related to the project will occur gradually and will depend to some degree on the <br />amount and timing of (1) construction expenditures, and (2) any credits from sale of surplus property <br />downtown. Electric customers could see an approximate 1% increase in 2009, with a 0 to 0.5% increase <br />in 2011, depending on timing of any credits from downtown property sales. Water customers could see <br />an approximate 4% to 9% increase in 2011, with the actual amount also dependent on timing of any <br />* <br />credits from downtown property sales. <br /> <br />Public Process. The EWEB Board has been considering the need for new facilities and possible relo- <br />cation since the late 1990s. The board’s decision process on this matter has been very deliberate and has <br />included: <br /> <br />? <br /> <br />Discussion at numerous board meetings and work sessions since 2005. All of those meetings <br />have included time for public comment. <br /> <br />? <br /> <br />Three advertised public briefings; one at Petersen Barn in the project area and two at the EWEB <br />headquarters. <br /> <br />? <br /> <br />Articles in the 2005 and 2006 editions of Pipeline, EWEB’s newsletter that is delivered by mail <br />to all customers. <br /> <br />? <br /> <br />EWEB staff and commissioners have given updates and answered questions about the project <br />during numerous presentations to neighborhood groups, civic and service clubs, and other groups <br />over the past two years. <br /> <br />? <br /> <br />Although not specific to the Roosevelt project, the EWEB Board conducted two public hearings <br />in 2005 related to the possible siting of a new hospital on the property. During those hearings, <br />public testimony was solicited and accepted related to relocation of EWEB facilities. <br /> <br />? <br /> <br />Current and comprehensive information has been made available on the utility’s web site <br />(www.eweb.org). <br /> <br />There has not been substantial customer comment on this project. Input has included the desire that <br />EWEB develop these new facilities economically, incorporate sustainability measures into the develop- <br />ment, and apply any riverfront sale proceeds to the Roosevelt project cost. EWEB has received very <br />little public testimony or other comments supporting continued use of the riverfront property as a utility <br />equipment and material storage yard. <br /> <br />It is also noted that, in addition to the EWEB process, both the U.S. Army Corps of Engineers and the <br />Oregon Department of State Lands have completed public review processes in conjunction with the <br />permitting related to the site. No public comments were received by either agency. <br /> <br /> <br />The Roosevelt Operations Center will be financed and owned by the Electric Utility. The Water Utility will lease space <br />* <br /> <br />from the Electric Utility with lease payments based on estimates of Water’s share of the facility. <br /> F:\CMO\2008 Council Agendas\M080213\S080213B.doc <br />