My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Ordinance on Oregon West Management
COE
>
City of Eugene
>
Council Agendas 2008
>
CC Agenda - 02/19/08 Public Hearing
>
Item 1: Ordinance on Oregon West Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:18:00 PM
Creation date
2/15/2008 11:03:25 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/19/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />requirement, the applicant has proposed to construct an additional Hunsaker Lane westbound <br />approach lane and to construct an additional Green Lane westbound approach lane, <br /> <br />As shown on Table 8 of the TIA (page 33), at the time of development (build year 2(08) the River <br />Road at Hunsaker/Irving intersection is projected to further degrade to perform at ,98 vie, As a <br />result of the proposed mitigation, the vie would remain at ,98 at the time of development (2008) <br />therefore the proposed amendments would avoid further degradation of the facility, as required by <br />subsection (3)(c). The TIA indicates that a tratlic signal \vas considered at the Green Lane <br />intersection, but that due to the proximity to adjacent signalized intersections, it was determined that <br />a signal at Green Lane would likely degrade the capacity of River Road north-south movements, <br />However, the TIA demonstrates that the proposed mitigation is sutJicient to avoid further <br />degradation, consistent with OAR 660-012-0060(3)(c). In order to ensure that the development <br />resulting from the proposed amendments will not cause further degradation of the intersection, any <br />future development of the site will be conditioned on the construction of these two approach lanes. <br /> <br />OAR 660-012-0060(3)(d) The amendment does not involve property located in an <br />interchange area as defined in paragraph (4)(d)(C),' and <br /> <br />Consistent with this subsection. the amendment does not involve property located in an interchange <br />area, as defined in OAR 660-012-0060(4)(d)(C). <br /> <br />OAR 660-012-0060(3)(e) For affected state highways, ODOT provides a written statement <br />that the proposedfunding and timingfor the identified mitigation improvements or measu.res <br />are, at a minimum, sufficient to avoidjurther degradation to theperformance of the affected <br />state highway. Hm.vever, if a local government provides the appropriate ODOT regional <br />office with lvritten notice of a proposed amendment in a manner that provides ODOT <br />reasonable opportunity to submit a written statement into the record of the local government <br />proceeding, and GDOT does not provide a written statement, then the local government may <br />proceed with applying subsections (a) through (d) of this section. <br /> <br />Consistent with this subsection, as indicated in the TIA, the amendment does not atTect a state <br />highway. ODOT indicated no concerns with this revised TIA. dated August 28, 2007. <br /> <br />Conclusion <br />Based on the available evidence, the proposal complies with Statewide Plmming Goal 12 as <br />implemented through OAR 660-012-0060, with the imposition of the following conditions of <br />approval to ensure that the necessary transportation improvements are in place prior to operation of <br />the commercial and residential uses: <br /> <br />The applicant shall record in the Office of the Lane County Clerk restrictive covenants on <br />the real property that is the subject of the proposed amendments, in a form acceptable to the <br />City Attorney, stipulating that any future development approval for the site shall require, by <br />the time of development, full and complete construction of an additional westbound <br />approach lane on Hunsaker Lane and an additional westbound approach lane on Green Lane. <br />The restrictive covenants shall be binding 011 any successive owner( s) of the property, are <br />enforceable by the City of Eugene any may be amended only with the express written <br /> <br />Staff Findings -- October 8,2007 <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.