Laserfiche WebLink
<br />public use to meet its needs and the stated parks priority plans of the City of Eugene. <br />Additionally, a public plaza/green space could be an opporttmity for the developer to <br />incorporate pervious areas to meet the storm water runoff and infiltration needs of the <br />rest of the development. Public storm water conveyance for this site is very limited <br />and the anl0tillt of stormwater rtilloff from the level of impervious surface proposed <br />will be significant. The use of df)rwells in Santa Clara has been prohibited due to the <br />high level of groundwater and the switch to surface infiltration is on. <br /> <br />. There are numerous vacant C2 parcels in our area. River Rd., Division Ave., and <br />Oroyan have vacant parcels currently, and the Safeway at Silver Lane and Grocery <br />Outlet at River Rd. and Hunsaker are closing this year creating two other large <br />parcels. There is no demonstrated need for more C2land within our neighborhood to <br />serve the greater Eugene area as supported by both the current commercial lands <br />study, the Metro Plan, and the RR/SC Urban Facilities Plan. <br />Eugene Commercial Lands Study-RiverRd.lSanta Clara subarea <br />Polky 11.0 Recognize that the commercial sites designated in the River Rd/Santa <br />Clara Urban Facilities Plan provide for adequate commercial supplyfor the area. <br />Consider additional commercial land in the vicinity of the Chambers Connector ff <br />needed to address community commercial needs. <br /> <br />Metro Plan Economic Element Policy #6. Increase the amount of undeveloped land <br />zonedfor light industrial and commercial uses correlating the effective sUPp~y in <br />terms of suitability and availability with the projections of demand. <br /> <br />RR/SC Urban Facilities Plan 2.3 Commercial ami Industrial Land Use findings: <br />The addition of 2 J acres of commercially zoned land at the River Rei. and Division <br />Ave. commercial area and the eight acres a/community commercial-designated land <br />allocated to the existing commercial area north of Wilkes Dr. is large enough to meet <br />virtually all of Santa Clara's commercial land needs that ),t'ere anticipated by the <br />Metropolitan Plan, including the commercial portion of the floating node <br /> <br />. The. subject site is identitied in TransPlan as "potential nodal development area 5- <br />C." Although the city of Eugene has not yet identified this as a node, the applicant <br />states that the proposal meets the intentions of nodal development for this parcel. <br />Nodal development in a residential area generally seeks to create a more balanced <br />neighborhood commercial center than is being proposed. The continued expansion of <br />commercial land fronting River Rd. is expressly prohibited in the refinement plan, <br />and the refinement plan specifically directs us to adopt zoning that is consistent with <br />the land use diagram and policies of the Urban Facilities Plan. <br /> <br />RR/SC Urban Facilities Plan General Land Use Policy 1 Adopt zoning that is <br />consistent with the land use diagram and policies contained in the land use element of <br />the Urban Facilities Plan <br /> <br />TransPlan Land Use Polky #1: Nodal Development <br />Nodal development centers will include a mix o.f housing types that achieve at least <br />an average density that is within the medium-density range jar residential uses. <br />