My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Ordinance on Oregon West Management
COE
>
City of Eugene
>
Council Agendas 2008
>
CC Agenda - 02/19/08 Public Hearing
>
Item 1: Ordinance on Oregon West Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:18:00 PM
Creation date
2/15/2008 11:03:25 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/19/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. . <br /> <br />5. The Analysis section indicates the TransPlan regional level of service standard, based upon volume to <br />capacity ratios, however, the City of Eugene also has a delay based level of service standard for <br />signalized intersections outside tbe CATS area of LOS "D" and LOS "E" for unsignalized <br />intersections and signalized intersections within the CATS boundary. SigCap is an analysis tool <br />primarily intended to provide the analyst with information used in planning applications and may <br />be useful to compare traffic conditions and design alternatives at individual signalized intersections. <br />Individual'movement vie ratios such as those indicated in Table 4 are not appropriate for <br />determining compliance with agency (City) mobility standards, such as for Eugene's LOS '.'D" for <br />sig'naUzed intersections, rather vie ratios sllQuld be used only for determining compliance with State <br />mobility standards for State facilities. <br /> <br />As indicated on the SigCap worksbeets in Appendix F (Intersection Performance Calculations), the <br />overall LOS at the intersectioD of River Road and HunsakerlIrving in the no-build is LOS E with <br />96% saturation assuming a signal timing cycle length of 120 seconds and LOS E with 970/0 <br />saturation with the same signal cycle length. As indicated in OAR 666-012-0060(1)(c)(C), the plan <br />amendment must not "Worsen the performance of an existing or ptamted transportation facility that <br />is otherWise projected to perform below tlte minimum acceptable performance standard identified in <br />the TSP or comprehensive plan ff as measured at the end of the planning period identified hi the <br />adopted transportation system plan (2015). Once projected volumes are adjusted as noted in <br />comment #3 above, the degradation in performance will be even greater. <br /> <br />6: Based on the missing information djscussed above, staff anticipates that Public Works will not be <br />able to concur with the analysis provided and conclusions indicated on pages 21 and 22 of the TPR <br />analysis. Mitigation to address the performance at tile intersection of Huns akerl Irving and River <br />Road will be necessary. <br /> <br />Page 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.