My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20406
COE
>
City of Eugene
>
Ordinances
>
2008 No. 20401-20425
>
Ordinance No. 20406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:50:27 PM
Creation date
3/14/2008 10:52:29 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20406
Document_Title
Levying Assessments on River Avenue
Adopted_Date
3/10/2008
Approved Date
3/12/2008
CMO_Effective_Date
3/12/2008
Signer
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT <br /> <br />The street improvements consist of34 to 44-foot wide paving. The improvements included <br />westbound and eastbound travel lanes with a continuous two way left turn lane, curb and gutters, <br />sidewalks, and storm water drainage system with water quality bioswales and water quality <br />structure, on street bike-lanes for the westerly 1300 feet and a multi-use path along the south side <br />of the road for the easterly 3100 feet. The project addressed the deteriorating roadway, increasing <br />volumes of traffic and provided for pedestrian safety and alternate modes. <br /> <br />ASSESSMENT <br /> <br />Costs were distributed in accordance with Eugene Code 7.175, and as outlined in the 2006 <br />Council adopted Hearings Official findings and recommendations, and the resolution forming the <br />LID. <br /> <br />The final unit assessable costs: <br /> <br />Paving lO-foot (per front foot) <br />Paving 7-foot (per front foot) <br />Sidewalk and drive aprons (per square foot) <br />Direct assessed stormwater (2 lots) <br /> <br />$ 114.77 <br />$ 85.34 <br />$ 6.26 <br />$4,562.02 <br /> <br />Total Assessable Cost <br />Total City Cost <br />Total Project Cost <br /> <br />$1,127,258.29 <br />$2,148,191.34 <br />$3,275,449.63 <br /> <br />River Avenue is classified as a major collector. As required by the Eugene Code, property <br />owners on a major collector street are assessed for a portion of the width of the street based on <br />zoning. The City pays for the remaining street and non-assessable storm drainage costs. The <br />non-assessable City share for this project will be funded from Transportation SDCs, Stormwater <br />SDCs and Stormwater and Wastewater Utility Funds. The utility funds are utilized for <br />maintenance work done under the construction contract. The total assessable costs also includes <br />the $34,670.88 the City will pay for the Federal Post Office. Assessment financing, a 10-year <br />payment plan through the City, is available to all property owners within the improvement <br />district, as provided by Eugene Code, Chapter 7. <br /> <br />PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON RIVER AVENUE <br />FINAL ASSESSMENT Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.