Laserfiche WebLink
<br />Exhibit B-1 <br />Errata to September 2001 TransPlan <br /> <br />expected to help the region maintain conformity with federal air quality standards. BRT, <br />combined with nodal development, is a key strategy in the regions compliance with alternative <br />performance measures for the Transportation Planning Rule. Commitment by the region to full <br />system build out of BR T within 20 years is essential to meeting the alternative performance <br />measures. The full system will include 61 miles ofBRT corridor service. The majority of each <br />corridor will include exclusive bus treatment. When funding or traffic conditions restrict <br />implementation of exclusive bus treatment within a corridor, priority should be given to <br />improvements providing the greatest benefit to travel timesavings. The BRT strategy will be <br />implemented to the extent that planning and engineering studies show that the system would <br />increase the use of transit, is supported by the community, and can be funded. As BRT is <br />implemented, LTD, Springfield, Eugene, Lane County, and ODOT will consider neighborhood <br />impacts when designing elements of specific segments. <br /> <br />Chapter 3 Errata <br /> <br />On Chapter 3, Page 7, remove reference to Appendix G by revising paragraph above "Column 1: <br />Name" to read: <br /> <br />The columns/fields of information common to each table are defined below. <br /> <br />On Chapter 3, Page 8, add reference to base year for cost estimates by revising the paragraph <br />below "Column 5: Estimated Cost" to read: <br /> <br />This field provides a determination of planning cost estimates. The estimated costs are <br />not precise engineering estimates, but are used as planning estimates to assist in <br />determining the financial impacts. Cost estimates are provided in 1997 dollars, consistent <br />with revenue estimates used in the plan. <br /> <br />On Chapter 3, Page 11, replace table titled Summary of Capital Investment Actions Roadway <br />Projects ($ Thousands) with updated table (attached to this errata packet) to reflect revised <br />calculations. <br /> <br />On Chapter 3, Page 12 and Page 13, fix references regarding corridors requiring further study <br />and major investments by revising the list of corridors beginning on the bottom of Page 12 and <br />the paragraph that follows on Page 13 to read: <br /> <br />1. Interstate 5 <br />2. Interstate lOS/Oregon 126 (Eugene-Springfield Highway) <br />3. Beltline Road (Highway 99 to Interstate 5) <br />4. Main StreetlMcKenzie Highway (20th Street to 70th Street) <br />5. McVay Highway (Franklin Boulevard to 30th Avenue interchange) <br />6. Franklin Boulevard (Glenwood section) <br />7. West 11th Avenue (Beltline to Chambers) <br />8. Coburg Road (Crescent to Oakway) <br />9. 18th Avenue (Bertelsen to Agate) <br />