Laserfiche WebLink
<br />Name <br /> <br />Geographic <br />Limits <br /> <br />Description <br /> <br />Jurisdiction <br /> <br />Estimated <br />Cost Length Number <br /> <br />Project Category: Study <br /> <br />Status: Progralnnled <br /> <br />1.5 @ Beltline @ Interchange Project development work ODOT $3,375,000 -- 606 <br />Study & Design <br />Main Street! 1-5 to UGB Access management plan ODOT ISpringfield $100,000 6.0 838 <br />Highway 126 <br />Eugene-Springfield 1-5 to Main Corridor Study ODOT ISpringfield $150,000 6.5 835 <br />Hwy. <br />Main St. and 52nd 52nd to Main Interchange Plans ODOT ISpringfield $100,000 1.5 96 <br />St./Hwy 126 Int. <br /> Status Sub-Total $3,725,000 <br /> <br />Status: Unprogrammed <br />1-5 Interchange Willamette River south Comprehensive study of 1-5 ODOT $750,000 250 <br />Study to 30th Avenue interchanges <br />18th Avenue Bertelsen Road to Agate Corridor study to determine Eugene $250,000 4.71 118 <br /> Street improvements <br />Chambers Street 8th Avenue to 18th Corridor Study to determine Eugene $250,000 0.8 136 <br /> Avenue improvements <br />Coburg Road Crescent Avenue to Access management! Eugene $100,000 2.24 619 <br /> Oakway Road safety-operational study <br />Ferry Street Bridge Oakway Road to Long-Range Capacity Eugene $250,000 1.08 139 <br /> Broadway Refinement Plan <br />South Bank Street Mill Street to Hilyard Develop refinement plan for Eugene, $250,000 178 <br />Improvements Street street system ODOT <br />W 11th Avenue Beltline Road to Access Management, Eugene $100,000 2.74 332 <br /> Chambers Street Safety, and Operational <br /> Study <br />Willamette 13th Avenue to 33rd Corridor study to determine Eugene $250,000 5.55 187 <br />Street! Amazon Avenue improvements <br />Parkway/Patterson <br />Street!Hilyard Street <br /> <br />Status Sub-Total <br /> <br />$2,200,000 <br /> <br />Project Category Sub-Total <br />TransPlan-Joint Adopting Officials Revisions <br /> <br />$5,925,000 <br />September 200 1 <br />Chapter 3, Page 28 <br />