My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20234 Exhibit B
COE
>
City of Eugene
>
Ordinances
>
2001 No. 20220-20243
>
Ordinance No. 20234 Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:51 PM
Creation date
5/30/2008 3:17:07 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20234
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />w., , <br /> <br />w,q <br /> <br />Chapter 3: Table la-Financially Constrained <br />20-Year Capital Investment Actions: Roadway Projects <br /> <br />'N ,.", ......"."",N....",.,w."".."... ... ..""... .. ,",."."."...."."......w,,,.,.,,.,. ........... .",.........,",,,, ....., ....., .., <br /> <br />Name <br /> <br />Geographic <br />Limits <br /> <br />Description <br /> <br />Jurisdiction <br /> <br />Estimated <br />Cost Length Number <br /> <br />Project Category: New Arterial Link or Interchange <br /> <br />Status: Programmed <br />Jasper Road Main Street to Jasper Construct 4-lane arterial; Lane County $10,400,000 3.2 66 <br />Extension Road phasing to be determined; <br /> improve RR X-ing at Jasper <br /> Rd; at grade interim <br /> improvement; grade <br /> separation long-range <br /> improvement <br />Terry Street Royal Avenue to Construct new 2 to 3-lane Eugene $1,116,000 0.44 487 <br /> Roosevelt Boulevard urban facility <br />West Eugene Seneca Road to Beltline W 11th - Garfield: 4-lane OOOT $17,283,000 1.3 336 <br />Parkway, (1A) Road new construction; pending <br /> Completion of a study of <br /> Transportation improvements <br /> In West Eugene <br /> Status Sub-Total $28,799,000 <br />Status: Unprogrammed <br />Beltline Highway West 11th Avenue to Continue widening to 4 OOOT $17,000,000 1.14 312 <br /> Roosevelt Boulevard lanes; new RR Xing, <br /> interchange @ WEP, grade <br /> separation @ Roosevelt and <br /> turn lanes on West 11th <br /> Ave (OOOT: West 11th <br /> North City Limits Stage 3) <br />Centennial 28th Street to 35th Street Construct 3-lane urban Springfield $3,000,000 0.5 930 <br />Boulevard <br /> <br />TransPlan-Joint Adopting Officials Revisions <br /> <br />September 200 1 <br />Chapter 3, Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.