My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2D: Resolution Concerning Modifciation of Stormwater SDC
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 06/12/06 Meeting
>
Item 2D: Resolution Concerning Modifciation of Stormwater SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:36:17 PM
Creation date
6/8/2006 10:44:53 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7.4 Application for Credit and Impact Reduction <br /> <br />An application for a credit or impact reduction, including related documentation and <br />information, shall be submitted by the applicant in the manner prescribed by the <br />City, together with any fee set by the City Engineer pursuant to Eugene Code, <br />1971 section 2.020. The applicant shall have the burden of demonstrating the <br />eligibility for a credit and/or impact reduction. No credit or impact re~uction shall <br />be granted for an SDC that has already been imposed, collected or agreed to be <br />paid in installments unless resulting from cancellation of an active permit, <br />expiration of a permit without being used, or an approved change of design of an <br />active permit. <br /> <br />7.4.1 Application for Impact Reduction <br /> <br />Applicants must submit their request for an impact reduction in writing, <br />accompanied by documentation that supports the basic function and <br />design criteria for estimated impact reduction. <br /> <br />For commercial development, impact reduction will be applied uniformly <br />for all lots or building sites in the development phase approved. Impact <br />reductions granted under this methodology document may be used in <br />subsequent phases of a development when the applicant demonstrates to <br />the satisfaction of the City Engineer that the program or improvements <br />continue to provide the anticipated reduction in demand, and the City has <br />received assurances or agreements from the developer, owner, and <br />owners successors, as approved by the City Engineer as is necessary to <br />ensure that the program or facility will continue to function as planned for <br />the agreed upon time period. Changes to the mitigated program or facility <br />attributable to the connection of an additional phase which results in any <br />deviation from the previously determined impact reduction will be <br />adjusted proportionately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.