My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4875
COE
>
City of Eugene
>
Resolutions
>
2006 No. 4856-4897
>
Resolution No. 4875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:50:03 PM
Creation date
6/14/2006 4:39:45 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/12/2006
Document_Number
4875
CMO_Effective_Date
6/12/2006
Repeal_Date
5/7/2007
Author
Mary H. Feldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 3 <br />Summary of Facility Process Component Allocation to System Capacity Parameters <br /> System Capacity Parameter <br /> Average Peak <br />Facility Process Component Flow Flow BOD TSS Indirect Total <br />Collection system ,pipeline ~ % 1 <br />Collection, system pump stations % % 1 <br />Preliminary treatment % % 1 <br />Primary treatment % % % 1 <br />Secondary tr~atment % % % 1 <br />Disinfection/outfall % % 1 <br />Biosolids (same for all three subcomponents) % % 1 <br />Tertiary filters ~ % % 1 <br />, Reuse facilities 1 1 <br />Odor control % % 1 <br />Peak flow management 1 1 <br />Support facilities (lndirects) 1 1 <br /> <br />Step Two · Growth Capacity Requirements <br /> <br />In developing SDCs, costs related to growth (see 'Cost Basis' below) are spread over <br />growth's total capacity requirements over the study period to determine the overall cost per <br />unit of growth by capacity measure. The study period is defined as a 20-year period, <br />consistent with facility planning requirements. The Department of Environmental Quality <br />(DEQ) stipulates that entities that own and operate wastewater facilities assume a 20-year <br />planning horizon when developing facility plans (see DEQ Guidance for Development of <br />Wastewater Facilities Plans, 2000). <br /> <br />To determine the capacity required by growth, the capacity required by existing users is <br />subtracted from the capacity projeCted in the facility plan to be required at the end of the <br />planning period. For peak flow estimates, existing users' current capacity requirements are <br />adjusted for anticipated 1/1 reductions (see Guidelines for the Preparation of Facilities Plans <br />and Environmental Reports for Community Wastewater Projects, i999). <br /> <br />Methodology Element Two: Develop Cost Basis <br /> <br />The cost basis represents the total costs that the SDCs are intended to recover. The following <br />methodological issu~s were addressed in developing the reimbursement and improvement <br />fee cost bases: <br /> <br />. Existing System Valuation (Reimbursement Fee) - The method for valuing existing <br />facilities with capacity to serve growth. <br /> <br />. Existing System Allocation (Reimbursement Fee) - The method for allocating existing <br />system facility value to growth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.