Laserfiche WebLink
<br />TABLE 3 <br />Summary of Facility Process Component Allocation to System Capacity Parameters <br /> System Capacity Parameter <br /> Average Peak <br />Facility Process Component Flow Flow BOD TSS Indirect Total <br />Collection system ,pipeline ~ % 1 <br />Collection, system pump stations % % 1 <br />Preliminary treatment % % 1 <br />Primary treatment % % % 1 <br />Secondary tr~atment % % % 1 <br />Disinfection/outfall % % 1 <br />Biosolids (same for all three subcomponents) % % 1 <br />Tertiary filters ~ % % 1 <br />, Reuse facilities 1 1 <br />Odor control % % 1 <br />Peak flow management 1 1 <br />Support facilities (lndirects) 1 1 <br /> <br />Step Two · Growth Capacity Requirements <br /> <br />In developing SDCs, costs related to growth (see 'Cost Basis' below) are spread over <br />growth's total capacity requirements over the study period to determine the overall cost per <br />unit of growth by capacity measure. The study period is defined as a 20-year period, <br />consistent with facility planning requirements. The Department of Environmental Quality <br />(DEQ) stipulates that entities that own and operate wastewater facilities assume a 20-year <br />planning horizon when developing facility plans (see DEQ Guidance for Development of <br />Wastewater Facilities Plans, 2000). <br /> <br />To determine the capacity required by growth, the capacity required by existing users is <br />subtracted from the capacity projeCted in the facility plan to be required at the end of the <br />planning period. For peak flow estimates, existing users' current capacity requirements are <br />adjusted for anticipated 1/1 reductions (see Guidelines for the Preparation of Facilities Plans <br />and Environmental Reports for Community Wastewater Projects, i999). <br /> <br />Methodology Element Two: Develop Cost Basis <br /> <br />The cost basis represents the total costs that the SDCs are intended to recover. The following <br />methodological issu~s were addressed in developing the reimbursement and improvement <br />fee cost bases: <br /> <br />. Existing System Valuation (Reimbursement Fee) - The method for valuing existing <br />facilities with capacity to serve growth. <br /> <br />. Existing System Allocation (Reimbursement Fee) - The method for allocating existing <br />system facility value to growth. <br />