Laserfiche WebLink
<br />2. Performance Improvements - Projects that increase system capacity by increasing the <br />level of performance provided by facilities. Unlike' capacity' projects that relate only to <br />the next. increment of capacity, performance upgrades are generally sized based on total <br />projected capacity needs at the end of the planning period (existing and future). <br /> <br />3. Rehabilitation - Projects designed to remedy an existing system deficiency and do not <br />enhance system capacity. <br /> <br />Capacity and performance upgrade projects can be new facilities, or upgrade/ expansion of <br />exisfug facilities. Rehabilitation projects are the replacement of outdated or worn out <br />, equipment or facilities. . <br /> <br />The majority of the projects will typically fall completely into one project type. However, <br />some projects may be split between capacity and performance types. The general criteria for <br />allocating projects to the above categorie.s are shown in Table 5. These criteria should be <br />applied in the d,evelopment of specific projects for inclusion in the appropriate planning <br />document or project list and should be considered and evaluated as part of the process of <br />adoption of such a plan or project list. <br /> <br />TABLE 5 <br />Summary of Project Type Allocation Criteria <br /> <br />Project Type <br />Capacity <br /> <br />Potential Criteria <br /> <br />A(jds new facilities/expands existing facilities <br /> <br />Provides new liquids treatment or biosolids capacity beyond existing <br />system d~sign standard or beyond the current permitted capacity <br /> <br />Adds new facilitieslimproves existing facilities <br /> <br />Provides capacity/enhanced capability sized for total future capacity <br />needs' <br /> <br />Driven by new regulatory requirement <br /> <br />Driven by increase in community performance standard <br /> <br />Technological efficiencies <br /> <br />Replaces existing facility or portion of facility <br /> <br />Does not serve growth either through existing available or new <br />capacity <br /> <br />Preserves existing facility performance/capacity <br /> <br />Performance Improvements <br /> <br />Rehabilitation <br /> <br />Once project costs have been allocated to system component and project type categories, <br />and the costs have been distributed to the system capacity parameters, the final step in the <br />project cost allocation process is to assign costs to user types. For the purposes of the SDC <br />methodology, there are two user types: 1) existing customers, and 2). new customers or <br />growth. Costs that are allocated to growth are incorporated into the SDC improvement fee <br />calculation. Costs allocated to existing customers must be paid through some other fundIng <br />sources (e.g., existing reserves or future user rates). <br /> <br />As indicated in Figure 3, the allocation of project costs to growth is a function of the type of <br />project and a detailed capacity analysis that identifies growth's share of: 1) planned capacity <br />expansion, and 2) total future load. <br />