My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4875
COE
>
City of Eugene
>
Resolutions
>
2006 No. 4856-4897
>
Resolution No. 4875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:50:03 PM
Creation date
6/14/2006 4:39:45 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/12/2006
Document_Number
4875
CMO_Effective_Date
6/12/2006
Repeal_Date
5/7/2007
Author
Mary H. Feldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix' E shows the calculation of 1a)e GO bond credit. <br /> <br />Future Payments <br /> <br />The ,methodology considers'whether growth will provide a net contribution through <br />wastewater user fee rates to the cost of capital improvements that benefit existing , <br />customers. If such a contribution is indicated, a credit is provided. The credit is based on a <br />present-worth analysis, structured as follows: <br /> <br />1. Annual capital costs (adjusted for inflation) associated with I existing customers' share of <br />the project list costs (net of rehabilitation costs) are estimated based on the <br />recommended phasing schedule. <br /> <br />2. The aImual capital expenditures are reduced by revenues from reserves and <br />reimbursement fees to estimate required debt funding' <br /> <br />3. Debt services costs are estimated for repayment of borrowed funds <br /> <br />4. Future billing units (average flow and pounds of BOD and TSS) are estimated for the <br />planning period based on system planning criteria ~ . <br /> <br />5. The annual user rate supported debt service per billing unit is determined for the life of <br />. the debt. <br /> <br />6. The present value of the future stream of rate payments is determined for each year of <br />the planning period. <br /> <br />A credit amount per unit of capacity is determined based on the year of development and <br />the projected length of future payments. <br /> <br />At the time of adoption of the project list upon which SDCs are to be based, or any periodic <br />modification to such list, an estimate of project financing costs will be made, based upon the <br />assumed timing of projects and other available funding sources. The proportion of this debt <br />financing to be funded by user rates attributable to users estimated to connect in each year is <br />calculated, and the net present value for each year of the planning period of this series of <br />cash flows is applied as a credit against the improvement SDC generated by the <br />methodology . <br /> <br />of; <br />
The URL can be used to link to this page
Your browser does not support the video tag.