My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20200
COE
>
City of Eugene
>
Ordinances
>
2000 No. 20184-20219
>
Ordinance No. 20200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 11:00:20 AM
Creation date
7/7/2006 3:21:21 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/26/2000
Document_Number
20200
Author
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The following additional points will clarify the scope of this analy'sis: <br /> <br />1. All sites directly affected by these amendments are considered in the following <br />analyses. <br /> <br />2. This analysis only considers impacts to the local inventory of buildable land <br />resulting from these amendments to the West Eugene Wetlands Plan. It does not <br />take into consideration changes resulting from other local plans, policies, or <br />actions. <br /> <br />3. The Metropolitan Industrial Lands Inventory Report (July 1993) identifies a <br />projected demand for industrial land in a range from 650 acres to 1,172 acres. <br />This projected demand was not broken down into any sub-categories, such as size, <br />type or location. As a result the analysis here does not address these sub- <br />categories. The Eugene Commercial Lands Study identifies a projected demand <br />for 523 acres of commercial land, including 109 acres of office commercial and <br />432 acres of non-office commercial land. There were no further break-downs of <br />the demand into other sub-categories such as size or location, and consequently <br />these sub-categories are not addressed here. The "Supply and Demand Analysis <br />in Acres" table for residential lands contained in the Metropolitan Area General <br />Plan separated out the aggregate demand for residential land into three sub- <br />categories: low density, medium density and high density residential. No other <br />sub-categories, such as size, or location were included in the analysis. <br />Consequently the analysis herein only addresses these three categories. <br /> <br />4. The three source documents relied upon here for analysis of available buildable <br />land include land inside the adopted urban growth boundary, which encompasses <br />land both inside and outside the Eugene city limits. Urban services are available <br />to all properties within the city limits, but are not immediately available to <br />properties outside the city limits. These properties outside the city limits must <br />annex to the City of Eugene in order to receive urban services. Consequently, if . <br />land outside the city limits is removed from the buildable lands inventory, it has a <br />less immediate effect because these properties are not developable until they are <br />annexed. One wetland site outside the city limits was removed from the buildable <br />lands inventory (site BA, amendment #21) and it totals 2.13 acres. <br /> <br />5. All areas designated by these amendments for protection and restoration are <br />vacant, undeveloped areas. Therefore, these amendments will not apply to <br />existing development, and do not apply new land use restrictions to existing <br />development.. Some wetland site designations affect an undeveloped portion of a <br />partially developed parcel. Of thirteen such sites, ten are designated at least in <br />part for Development. The partially developed lots are shown in the table below: <br /> <br />Multiple Site Amendments Ordinance, Exhibit B (Statewide Planning Goal Findings) <br /> <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.