Laserfiche WebLink
<br />of a building permit, or as soon thereafter as a sewer system is available. Developed properties <br />are allowed to choose the time when they will connect and be annexed. Only properties <br />requesting connection to sewer services have been included in the proposed LID. All properties <br />to be included in the LID will have submitted an annexation agreement. <br /> <br />Based on the minimum necessary number of agreements and the terms of the 1991 agreement <br />with the ICCO, the City Engineer initiated the project. Property owners were notified of the <br />proposed hearing. The project was advertised and three bids were received. The bids were <br />opened on May 28, 1997. The low bid was submitted by Eugene Sand and Gravel in the amount <br />of $769,668.00. <br /> <br />PROJECT <br /> <br />The project includes the installation of 4151- feet of gravity sewer pipe from Beltline Road to <br />Kaiser A venue. Properties to the north of Kaiser A venue will be served from a system in <br />Irvington Drive. As of June 12, 1997, six property owners within the proposed project limits <br />have signed annexation agreements and support the extension of the service. These owners <br />represent ten individual parcels of land and approximately 21 percent of the project cost that can <br />be assessed. Six other property owners, representing an additional twenty percent of the property <br />that could be assessed responded positively to a recent survey. These property owners will be <br />included in the local improvement district if they consent before the formation of the district. <br /> <br />ASSESSMENTS <br /> <br />The source of funding for this project is from direct assessments against those properties that will <br />be included in the LID and through 8-inch equivalent assessments from those properties not <br />included in the LID that will ultimately receive service from these improvements. All properties <br />that have not signed an annexation agreement will be included in the computation of assessable <br />costs if they might be served at some later date, but they will not be included in the LID, assessed <br />or receive service until an annexation agreement is executed. Costs for the project will be <br />apportioned on a per-square-foot basis for the lateral sewer, and on a per-each basis for the <br />service connection points (service lines). The assessable costs for those properties not included <br />in the LID will be born by the City of Eugene through the sewer fund until such properties are <br />annexed and request service. At that time, an equivalent assessment will be collected, as <br />provided in Eugene Code, ~ 6.476. <br /> <br />Special Factors <br /> <br />There are two factors in this particular local improvement district that are not usually found in <br />the formation of a local improvement district. One unique factor is that the benefits of the <br />improvement will not be made available to all the properties that could be served when the <br />project is completed. In accord with the terms of the agreement reached between the City and the <br />ICCO, property owners are allowed to delay connection with the sewers until some time after the <br /> <br />SANITARY SEWER, TRENCH REPAIR AND PAVING IN PRAIRIE ROAD FROM BELTLINE <br />TO KAISER A VENUE - FORMA TION OF A LOCAL IMPROVEMENT DISTRICT Page 2 <br />