Laserfiche WebLink
<br />project is completed. The second unusual aspect of the project is that instead of having the entire <br />improvement constructed after the LID is formed, this LID involves the inclusion of cost for <br />some already constructed sewers that will only become useful upon completion of the LID. <br /> <br />Approximately $396,438.00 of the total assessable cost represents the share for properties <br />adjacent to Prairie Road not wishing to receive sewer service at this time. These properties have <br />been included in the computation of assessment unit costs. Approximately $360,128.00 of the <br />assessable cost will be borne by the City. This represents cost associated with the oversize pipe <br />and the prorated cost associated with the combined Prairie Road, Irving Road projects. <br /> <br />The cost to resurface Prairie Road will be distributed among all properties that can receive <br />service from this system. The cost will be broken into two components. Resurfacing cost <br />associated with the main line sewer trench will be part of the lateral cost. The resurfacing cost of <br />the service line trench will be part of the service cost. <br /> <br />In 1996, a portion of this sewer system was constructed as part of Lane County's improvement <br />project along Irving Road. Generally, properties along Irving Road from the Northwest <br />Expressway west to 1900 feet west of Prairie Road will be served by this portion of the system. <br />These properties where not assessed for this construction. Properties along Irving Road, that <br />have not requested to be included in the LID, will pay an 8-inch equivalent assessment as they <br />connect to the sanitary sewer. <br /> <br />The sewer along Irving Road is an integral part of the sewer system that will provide service to <br />this portion of Prairie Road. The assessable costs from the construction of both the Prairie Road <br />bid and the payments to lane County for the Irving Road system construction are included in the <br />calculation of the cost per square foot. This will provide an equitable distribution of the costs <br />over the entire area served by the Prairie Road sanitary sewer system. <br /> <br />Assessment Cost <br /> <br />Costs listed below are the estimated assessment cost calculated from the low bid including a ten <br />percent contingency allowance, administration charges, and other charges associated with the <br />project, as is allowed in Eugene Code, S 7.175. The final assessment will be based on final <br />contract costs, and other actual and direct costs attributable to the project. <br /> <br />Based on the low bids, the estimated unit amounts on which to base the preliminary sanitary <br />sewer assessment amounts are: <br /> <br />Assessable Cost Prairie Road: <br />Assessable Cost Irving Road: <br />Total Assessable Cost: <br /> <br />$ 698,868.58 <br />$ 211,137.72 <br />$ 910,006.30 <br /> <br />SANITARY SEWER, TRENCH REPAIR AND PAVING IN PRAIRIE ROAD FROM BELTLINE <br />TO KAISER A VENUE - FORMA nON OF A LOCAL IMPROVEMENT DISTRICT Page 3 <br />