Laserfiche WebLink
<br />The detailed calculation for each component of the parks SDC and the Cost of Service formula are <br />set forth in Appendix E. The parks SDC rate can be found in the current adopted fee schedule in <br />Appendix F. The rate per dwelling unit is determined based on equivalent dwelling units (EDU). <br /> <br />The parks SDC for a proposed development is determined by multiplying the rate per dwelling unit <br />(EDU) by the number of dwelling units in the proposed development. The cost per EDU is the sum <br />of all parks system components identified in Appendix E. There is currently no parks SDC for non- <br />residential development. <br /> <br />7.0 Credits and Impact Reductions <br /> <br />This section provides detail on the City's administration of SDC credits and impact reductions. <br />Potential sources, criteria for eligibility, and the basis for calculation of credit and impact reductions <br />are defined, in this Methodology and in Eugene Code, section 7.730. A list of examples of facilities <br />and programs which are potentially eligible for credit and impact reduction appears in Table 2 of this <br />section. (Note: As development standards change some examples may no longer be considered <br />eligible for reduction but may influence future rates.) <br /> <br />SDCs may be reduced by one or more of the following processes: <br /> <br />. Impact Reduction, based on quantified mitigation of demand generated by the <br />development for new identifiable capital improvements; <br /> <br />· Credit, based on the specific costs for privately engineered construction of certain public <br />improvements as part of the development; <br /> <br />· Credit based on previous payment or use. <br /> <br />Adjustment of SDCs due to credits and impact reductions: <br /> <br />. Shall not be given for improvements constructed or programs instituted prior to City <br />approval. <br /> <br />· Shall be applied up to the maximum SDC fee for each system. <br /> <br />. Shall reduce the SDCs paid on building permits at the time of issuance; credit or impact <br />reduction amounts applied will not be greater than the SDC fees. <br /> <br />· Shall be applied to a particular system (e.g., Transportation, Stormwater, Wastewater, <br />Parks); credits or reductions approved for a particular system can not be transferred or <br />applied to any other system charges. <br /> <br />. Shall be applied to the SDCs for the particular development, may only be further applied <br />to subsequent phases of the same development for which the improvement was <br />constructed or program instituted, and can not be transferred or applied to other <br />properties or developments. <br /> <br />7.1 Impact Reductions or Mitigation <br /> <br />Impact reduction will be based on private physical improvements, as defined in Appendix A, <br /> <br />City of Eugene sDC Methodology <br /> <br />Page 11 <br />