My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4740
COE
>
City of Eugene
>
Resolutions
>
2002 No. 4697-4745
>
Resolution No. 4740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:24 PM
Creation date
7/13/2006 1:16:58 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
9/23/2002
Document_Number
4740
CMO_Effective_Date
9/23/2002
Repeal_Date
5/7/2007
Author
Kathleen A. Fieland
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />METHODOLOGY: <br />City of Eugene Systems Development Charges <br />Appendix B <br />Transportation System Charge Detail <br /> <br />1.0 Transportation sDC Methodology <br /> <br />The transportation SDC methodology is based on a level of service (LOS) approach, and <br />consists of a street component and an off-street bicycle path component. The street <br />component is a combination of improvement and reimbursement fees. <br /> <br />Development of the SDC under the LOS methodology includes the following basic steps: <br /> <br />· Determine SDC cost basis <br /> <br />· Define system capacity <br /> <br />· Calculate the unit cost of capacity <br /> <br />· 'Develop SDC rate schedule <br /> <br />These steps are discussed below for the street and bicycle components. Related information is <br />displayed in Figures 2 and 3. <br /> <br />1.1 Street Component <br /> <br />1.1.1 Formula <br /> <br />The street component is determined based on the average cost per lane mile of <br />the arterial and collector street system and the estimated lane miles required by <br />an average trip, given a specified level of service. The SDC calculation under a <br />LOS approach is represented by the following formulas <br /> <br />Cost per Trip (street) = <br /> <br />A verage Cost Per Lane Mile of Street System X Average Lane Miles Per Trip <br /> <br />1.1.2 Step 1 - Determine sDC Cost Basis <br /> <br />The cost basis is the average cost of constructing a lane mile in the arterial and <br />collector street system. The average cost per lane mile is based on a <br />Replacement Cost New valuation, whereby all facilities are valued in terms of <br />current year dollars, thus capturing any inflationary impacts, as well as changes <br />in market conditions since original construction of assets. In calculating the <br />average cost per lane mile in the transportation system, the following cost <br />components are considered: <br /> <br />· Collector and Arterial Streets <br /> <br />> Non-assessable Linear Construction Costs <br /> <br />> I ntersection Construction Costs <br /> <br />> Traffic Signal Costs <br /> <br />City of Eugene sDC Methodology <br /> <br />Transportation, Page B- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.