Laserfiche WebLink
<br />1.3.3.3.2 Development Specifications <br /> <br />The study shall be based upon what a typical development like <br />the one proposed will generate in trips at build-out an when in full <br />use and production, rather than upon the specific proposed <br />development. <br /> <br />1.3.3.3.3 Specifications For Number of Sites <br /> <br />A minimum of five local sites with comparable land use shall be <br />proposed for the study and approved by the City Transportation <br />Engineer. If, in the sole discretion of the City Transportation <br />Engineer, there are insufficient local sites, the City Transportation <br />Engineer will consider alternate sites within the states of Idaho, <br />Oregon or Washington. The sites shall have land uses that are of <br />comparable general description to that proposed upon build-out. <br /> <br />1.3.3.3.4 Specifications For Traffic Study Design <br /> <br />The traffic study shall be designed in accordance with the <br />methodology described in the Institute of Transportation <br />Engineers Trip Generation Manual, current edition. <br /> <br />1.3.3.3.5 Specifications For Description and Drawings <br /> <br />The request to use the alternate calculation shall include a <br />detailed description and drawing of the proposed development <br />site, a description and drawing of each sampling site, a <br />description of why these sites are representative of the impact <br />likely to be generated by the proposed development and such <br />other information as may be required by the City Transportation <br />Engineer. <br /> <br />1.3.3.3.6 Specifications For Report Format <br /> <br />The completed report of the study shall be in a form approved by <br />the City Transportation Engineer and upon its completion shall be <br />submitted to the City Transportation Engineer for approval. <br /> <br />1.3.3.4 Approval and Outcome of Alternate Calculation Traffic Study <br /> <br />The City Transportation Engineer may approve, approve with conditions <br />or reject the trip generation rate calculated in a report prepared under <br />paragraph 1.3.3 hereof. Upon approval the trip rate for the proposed <br />development shall be used to calculate the transportation SDC. In the <br />event that the Alternate Calculation results in a transportation SDC less <br />than the Standard Calculation, upon approval of the Alternate Calculation <br />by the City Transportation Engineer, the City shall refund the excess <br />transportation SDC collected to the applicant or reduce the amount the <br />applicant agreed to pay. If the approved Alternate Calculation results in a <br />transportation SDC greater than the Standard Calculation, the applicant <br />shall pay the underage to the City or modify the agreement to pay to <br />include the underage. In the event the applicant fails to promptly pay the <br />underage to the City or to promptly modify the agreement to pay, the City <br /> <br />City of Eugene sDC Methodology <br /> <br />Transportation, Page B- 7 <br />