Laserfiche WebLink
<br />TABLE 7 <br /> <br />LOCAL WASTEWATER PLUMBING FIXTURE UNIT RATES <br /> <br /> <br />local Wastewater; <br />SDC <br /> <br />A rate per PFU may be assigned by the City Engineer should a proposed use not be represented by one of the published SDC use <br />codes and for which a default flow assignment is not representative of the proposed flow. In the case of those proposed <br />developments that are determined to have a potential for exceptional water usage, the City Engineer may require that the Owner(s) <br />enter into an agreement with the City to review water usage or wastewater discharge at such time the development is in full use or <br />production as the final basis of the local wastewater SDC. A complete list of wastewater SDC I HUD BPR use codes is provided in <br />Appendix A. <br /> <br />City of Eugene SDC Methodology <br /> <br />Wastewater, Page C- 5 <br />