My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4740
COE
>
City of Eugene
>
Resolutions
>
2002 No. 4697-4745
>
Resolution No. 4740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:24 PM
Creation date
7/13/2006 1:16:58 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
9/23/2002
Document_Number
4740
CMO_Effective_Date
9/23/2002
Repeal_Date
5/7/2007
Author
Kathleen A. Fieland
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2.0 Regional Metropolitan Wastewater Management Commission Wastewater <br />System Development Charge (Regional Wastewater Charge) <br /> <br />2.1 MWMC Wastewater SDC Formula <br /> <br />In addition to the local wastewater SDC collected, a Metropolitan Wastewater <br />Management Commission (MWMC) Systems Development Charge (also known as the <br />Regional Wastewater SDC) will be collected on all new connections to the system. This <br />charge is a combined reimbursement and improvement SOC. The Charge is meant to <br />recoup the region's investment in reserve sewage treatment capacity and recover an <br />equitable share of the capital necessary to increase capacity for new development. This <br />charge is imposed on all new connections by all new or existing development in the <br />Eugene-Springfield area, and for expansion or changes in use of existing development <br />that increase impact on the MWMC facilities. When recommended by MWMC, the City <br />will adopt amendments to this methodology pursuant to EC 2.019 and 2.020. <br /> <br />The reimbursement fee is based on the current value of the regional wastewater facilities <br />in place on the date the rate is established. Outstanding debt and any state and federal <br />grants are subtracted from this amount to determine the local equity. An analysis of the <br />regional wastewater facilities reveals that there are several individual measures of <br />capacity which impact cost and together determine the overall capacity of the regional <br />wastewater system. These measures of capacity are average flow, peak flow, <br />biochemical oxygen demand (BOD), and suspended solids (SS). The present capacity of <br />the wastewater facilities are shown in Table 8. Based upon the regional system analysis, <br />the value of the regional system is allocated to each of these types of capacity, reflected <br />in the percentages shown in Table 8. Costs per unit of each capacity measurement can <br />be determined by dividing each measurements allocation of local equity by its capacity. <br /> <br />The improvement fee is based on the estimated future cost of capacity-increasing <br />projects included in the MWMC five year capital improvement program at the time the fee <br />is calculated, the allocation of that future cost to the capacity measurements, and the <br />amount of each type of capacity being increased for each element. MWMC intends to <br />maintain a twenty year schedule of capital projects and for individual capacity-increasing <br />capital projects to be scheduled to begin when one or more of the individual <br />measurements of capacity are estimated to reach 850/0 of their design. Projects will move <br />into the MWMC CIP as their scheduled construction year enters the CIP's five year <br />window. <br /> <br />2.2 Calculating the MWMC wastewater SDC <br /> <br />The MWMC wastewater SDC shall be determined by using the reference data contained <br />in Table 10 which describes flow estimation units (FEU) and associated flow and strength <br />impacts of various types of development together with the unit cost of flow, BOD, and SS. <br />If information for a particular development is not found in Table 10, it shall be formulated <br />using average data of like or similar development as determined by the City Engineer. <br />For any development, the MWMC wastewater SDC is determined by the following <br />formula: <br /> <br />}> Multiply the estimated gallons per day of flow per FEU, estimated pounds per day <br />BOD per FEU, and estimated pounds per day SS per FEU by their respective unit <br />cost; <br /> <br />City of Eugene SDC Methodology <br /> <br />Wastewater, Page C-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.