Laserfiche WebLink
<br />>- Sum these amounts, to derive a total cost per FEU for a specific type of <br />development; <br /> <br />>- Multiply the total cost per FEU for a development type by the number of FE Us for a <br />development application. <br /> <br />For more detailed and specific numerical data on FEU calculations, see Table 8. For <br />formula illustrations, see Figure 5 in this Appendix. <br /> <br />2.2.1 MWMC Process Wastewater <br /> <br />The MWMC wastewater SDC for development that discharges process wastewater <br />to the wastewater system will be charged on the basis of the strength of that <br />discharge. The rates per FEU for land uses listed in Table 10 include process <br />wastewater charges. For uses not otherwise listed in Table 10 that include process <br />wastewater, the MWMC SDC will be calculated by combining the charge for unit of <br />development for general industrial uses, and adding the charge for the process <br />wastewater FEU that matches the strength of the proposed discharge. The strength <br />classes shown in 10 are the same strength classes used by MWMC in the user fee <br />system. <br /> <br />2.2.2 MWMC Wastewater SDCs For All New Development with Annual Average <br />Daily Flow Equal to or Greater than 100,000 Gallons, and for Existing Development <br />Increasing Flow by or Greater than 100,000 Gallons per Day <br /> <br />Before calculating the SDC for any development with an anticipated discharge of <br />100,000 gallons or more of sewage per day, the Executive Officer of the MWMC <br />(EO) shall examine the developments impact on the twenty year schedule of capital <br />projects. If one or more capacity-increasing projects will move into the 5-year CIP <br />as a result of the development, the EO will establish new unit costs (based on the <br />total costs of the amended 5-year CI P) upon which SDCs for all development will be <br />calculated. If the MWMC wastewater SDC rate is modified, the modified fee will be <br />applied to the development that caused the need for the modification and to all <br />future development. <br /> <br />City of Eugene SDC Methodology <br /> <br />Wastewater, Page C- 8 <br />