My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4488
COE
>
City of Eugene
>
Resolutions
>
1996 No. 4474-4510
>
Resolution No. 4488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:46:55 PM
Creation date
7/13/2006 8:15:23 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/10/1996
Document_Number
4486
CMO_Effective_Date
6/10/1996
Author
Warren G. Wong
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />lots that do not fit all three criteria, staff will consider that the channel area is part of the open <br />space which can be used by the property and will generally benefit from the sewers. <br /> <br />DRYLINES <br /> <br />The proposed 1996 LID includes approximately six properties adjacent to previously constructed <br />sewers. These previously constructed sewers are located in Maranta Cul-de-sac. Typically, these <br />sewers were installed in the public rights-of-way by private subdivision developers in the 1970s. <br />Because they cannot function until they are connected to a working sewer system, these sewers <br />are called "drylines." The City has evaluated the utility of these "drylines" through inspection <br />and testing. It has been determined that these "drylines" can be used and the "drylines" will be <br />connected to the sewers to be installed in 1996 on Maranta Street south of the Maranta Cul-de- <br />sac. The cost incurred by the City for this testing, evaluation and construction process will be <br />distributed among the benefited properties through a lateral assessment. The incurred cost will <br />include costs for engineering, inspection, cleaning, testing, construction, administration services <br />and short term financing. If it is found that any of the "dryline" service connection points cannot <br />be used, a new service will be installed under the 1996 contract, and the benefited properties will <br />be assessed based on the 1996 per-each construction cost for a service. This is consistent with <br />past practices and conforms to the City's general policy of assessing propeties for improvements <br />if they have not previously been assessed for those improvements. <br /> <br />UNDEVELOPABLE LOTS IN COMMON OWNERSHIP WITH DEVELOPED LOTS <br /> <br />At several locations throughout the proposed LID, there are undevelopable lots adjacent to and in <br />common ownership with developed properties. Typically, these parcels are developed in <br />common with the adjacent parcel as a lawn or garden area and are considered undevelopable <br />because they are landlocked or have an insufficient size to allow them to be developed as they are <br />currently configured. In such cases, existing practice has been to include the undevelopable lot <br />with the commonly owned developed lot for purposes of calculating the lateral assessment and <br />local systems development charge. This practice will be followed in the present LID as well. <br /> <br />ASSESSMENT COSTS <br /> <br />Listed below are the Engineer's estimate for the 1996 construction. The costs reflect the three <br />City contract basins (S, X and U being combined into a single LID. <br /> <br />The estimated costs reflect the low bid costs, 10 percent contingency of the contract cost, 5 <br />percent administration charges, anticipated legal fees, right-of-way costs, consulting fees, short- <br />term financing costs, bond anticipation notes, costs for Engineering services, and other charges <br />associated with the project which are allowed to be assessed by EC 7.175. The final assessment <br />will be based on final contract costs, actual Engineering service costs, actual short-term financing <br />and BAN costs, a 5 percent finance administration cost, and other direct costs attributable to the <br />project. <br /> <br />SANTA CLARA SEWER BASINS "S" "X" AND "U" <br />Findings and Recommendations - Jobs 2928, 3010 and 3398 <br /> <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.