Laserfiche WebLink
<br />Approximately $206,051 of the total assessable cost represents the share for vacant properties <br />and has been included in the computation of assessment unit costs. Vacant lots will not be <br />assessed until the lots are developed. <br /> <br />The project includes several street repair components: trench patch of various types, street repair <br />beyond the trench, and street reconstruction. On May 16, 1990, Lane County Commissioners <br />agreed to pay the cost of that work. Since these costs will be borne by Lane County they will not <br />be assessed. They have been deducted from the total estimate of costs and the total assessable <br />costs. If Lane County chooses to no longer participate in these costs, the costs will be included in <br />the final assessment. Road repair items will be included in the assessment if not funded by Lane <br />County. Based on low-bid costs, the road repair cost would be an additional $0.08 per square <br />foot of assessable area. <br /> <br />There are two streets, Ross Lane and Lone Oaks Drive that are in City of Eugene's jurisdiction. <br />These streets are not part of Lane County's road repair commitment. The cost to resurface these <br />streets will be distributed among all the property owners within the LID. <br /> <br />Based on the low bids, the estimated unit amounts on which to base the preliminary assessment <br />amounts are: <br /> <br />Total Assessable Cost: <br />Total Assessable Area: <br /> <br />$ 3,772,252.61 <br />8,491,641 square feet <br /> <br />Lateral Costl: <br />Service Cost: <br />Local SDC: <br />MWMC: <br /> <br />$ 0.324 per square foot of assessable area <br />$ 1,310.00 each <br />$ 0.025 per square foot of total lot <br />$ 350.002 per single family dwelling <br /> <br />Notes: <br /> <br />I Lateral costs do not include trench patch or reconstruction cost anticipated to be paid by Lane <br />County. <br />2 The current MWMC fee is $332.00 for a single-family dwelling. This estimate anticipates an <br />increase in July 1996. <br /> <br />When property owners in the 1996 construction basins requested estimates, the City suggested <br />the property owners contact the City in early May, after bids were received. When given, pre-bid <br />estimates were based on a conservative assumption that 1996 prices would be higher than 1995 <br />prices. For a median-size lot of 9200 square feet the pre-bid estimate (including SDCs) was <br />$5,468. Based on the low bids, the current estimate (including SDCs) for a median-size lot is <br />$4800. <br /> <br />SANTA CLARA SEWER BASINS "S" "X" AND "U" <br />Findings and Recommendations - Jobs 2928, 3010 and 3398 <br /> <br />Page 5 <br />