My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4488
COE
>
City of Eugene
>
Resolutions
>
1996 No. 4474-4510
>
Resolution No. 4488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:46:55 PM
Creation date
7/13/2006 8:15:23 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/10/1996
Document_Number
4486
CMO_Effective_Date
6/10/1996
Author
Warren G. Wong
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Log - Mary Thompson - Actions regarding secondary sewer <br /> <br />AUQust 22. 1992 <br />· · Letter from Michelle Cahill, Project Manager, regarding sanitary sewer options <br />for 84 Green Lane. <br /> <br />Two options given: 1) connect to existing sewer available along southerly end <br />of the property, and 2) build a private line under the conditions of a revokable <br />permit along Green Lane to connect in the area of manhole N5W2-103. This <br />line would need to be reconnected to the Green Lane Sanitary Sewer <br />scheduled for 1996. <br /> <br />December 7. 1995 <br />· Telephone call to Sue Malone asking for information on where the sewer <br />would be run on Green Lane now that all Green Lane properties west of <br />manhole N5W2-103 are connected to the sewer or - in the case of the 3 <br />taxlots to the north belonging to the school - will not be developed in the <br />foreseeable future. <br /> <br />Sue suggested calling in January when the team would start working on the <br />1996 project. <br /> <br />Regarding the three school taxlots (40.0., 30.0., and 200) Sue mentioned that <br />vacant unannexed and developable parcels will not be accessed for sewers <br />until they are developed. She also said that the sewer project is not required to <br />serve vacant property. <br /> <br />January 16. 1996 <br />· · Letter to Sue Malone suggesting there would be no need to construct the <br />Green Lane sewer west of manhole N5W2-103 because all properties to the <br />south of Green Lane are connected to the existing sewer and the properties to <br />the North of manhole N5W2-1o.3 are either connected to the sewer or are <br />vacant. <br /> <br />January 30.. 1996 <br />· · Response from Jerry Behney, Senior Engineering Technician, stating that the <br />four developed taxlots on River Road north of Green Lane are required to be <br />. served through the River Road/Santa Clara sewer project. Therefore the sewer <br />line will be built to accommodate these taxlots. <br /> <br />April 15. 1996 <br />· · Received notice regarding May 5 Information Session, May 15 Public Hearing, <br />and June 10. City Council Action. <br /> <br />May 1. 1996 <br />· Jarvis talked with neighbor Stan Vanderhoff who said he was partitioning part <br />of his property in order to defer sewer assessment charges. <br /> <br />.'" i <br /> <br />Mary Thompson, 84 Green Lane, Eugene 97404 <br /> <br />Page 1 . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.