Laserfiche WebLink
The 2035 TSP contains policies related to development along key multi-modal corridors, transportation <br />demand management and the encouragement of transportation without reliance on automobiles, <br />including transit, bicycles, and pedestrian travel. The 2035 TSP incorporates the Eugene Climate <br />Recovery Ordinance goal of by year 2030 reducing community-wide use of fossil fuels by 50 percent <br />compared to 2010 usage. This goal and policies are related to the need to maintain and improve the air <br />quality in the metropolitan area. Projects identified in the 2035 TSP will be designed and constructed in <br />accordance with applicable federal, state, and local regulations. <br />Additionally, from 2013 to mid-2015 the City participated in a scenario planning process led by the <br />Central Lane MPO. The scenario planning process examined how transportation policies might affect <br />equity, public health, economic vitality, and greenhouse gas emissions in the region. The state required <br />the project partners to examine at least one scenario that would achieve a 20 percent reduction (below <br />2005 emissions levels) in greenhouse gas emissions from light vehicles. Generally, the 20 percent <br />greenhouse gas emission reduction target of the scenario planning study is consistent with the goal of <br />the Climate Recovery Ordinance. While the preferred scenario selected by the Central Lane MPO is not <br />a statement of regional policy and the strategies are not intended to be directive or regulatory, the 2035 <br />TSP incorporates and advances many of the strategies identified by the Central Lane MPO as a way of <br />achieving the preferred scenario. Some specific examples of how the 2035 TSP advances the preferred <br />scenario strategies are as follows: <br />1.The 2035 TSP plans for significant investment in active transportation over the next 20 years. <br /> <br />(Active transportation strategies #1 & #2) <br />Of the 264 projects planned in the 2035 TSP to be built over the next 20 years (excluding <br /> <br />those to be built upon development), 239 of the projects are entirely pedestrian and <br />bicycle projects; those projects include 89 neighborhood greenways, 22 on-street bike <br />lanes, 18 shared use paths, 12 protected bike lanes, and 85 separated path/sidewalk <br />projects. <br />Six of the 264 projects are transit projects, which include improving frequent transit <br /> <br />service and multimodal travel along numerous transit corridors. <br />These 245 bicycle, pedestrian, and transit projects represent 51% of the total <br /> <br />transportation dollars that are planned to be spent over the next 20 years. <br />Of the 19 remaining projects, 6 of the projects are complete street upgrades to existing <br /> <br />roadways; all 6 of these projects have a significant bicycle and pedestrian component. <br />These complete street projects represent an additional 10% of the total transportation <br />dollars. <br />Not counting the three rail projects (which amount for 6% of the total transportation <br /> <br />dollars), only three projects planned for the next 20 years have no explicit bicycle, <br />pedestrian, or transit component contained in their project descriptions. These three <br />projects represent approximately 8% of the total transportation dollars that are planned <br />to be spent over the next 20 years. <br /> <br />2.Establishment of a bike share program is currently underway and is one of the 2035 TSP <br /> <br />bicycle policies. (Active transportation strategy #3) <br />3.Identified potential action items for meeting 2035 TSP policy objectives include providing <br /> <br />education and awareness programs, such as SmartTrips and school-based transportation <br />options (including Safe Routes to School) to improve safety for all travelers and providing <br />support for Safe Route to School programs and other programs that create safe walking <br />Exhibit A to an Ordinance Concerning Long Range Transportation Planning <br />Page 5 of 63 <br /> <br />