My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2017 City Council Agenda
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2017
>
03-13-2017
>
03/13/2017 City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:26:29 AM
Creation date
3/10/2017 9:18:58 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
3/13/2017
CMO_Effective_Date
3/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Increased transparency; <br />• Enhanced accountability; and <br />• Reduced complexity and redundancy. <br />Changes to the FY18-23 CIP, include the following: <br />• Capital projects and programs in this CIP must have secured or identified funding, projects <br />without secured or identified funding are no longer included in the CIP; <br />• Updated project selection criteria information by program area; <br />• Project status update tables to provide details on progress of previously approved capital <br />projects and programs; <br />• Additional information on the development of the CIP in relation to other City planning <br />processes. <br />FY18-23 CIP Projects <br />The capital projects and ongoing capital improvement programs in this CIP total approximately <br />$162 million. <br />Transportation is the largest portion of the CIP, with approximately $53.9 million of anticipated <br />spending. Pavement preservation capital projects account for $17.1 million of this amount, and <br />spending from the 2012 Transportation Bonds approved by voters, accounts for another $15.1 <br />million. Federal funds are projected to represent $12.9 million in Transportation projects over the <br />next six fiscal years. <br />Public Buildings and Facilities is the second largest category with $32.4 million in proposed <br />projects, including $4.5 million in identified funding for a permanent Farmers' Market. Public <br />Buildings and Facilities also has proposed $8.1 million for primary building systems and $5.9 <br />million for building service systems. <br />Parks and Open Space (POS) represents the next largest category with $23.3 million for proposed <br />capital projects. POS projects include $5.2 million that has been identified for the Park Blocks <br />downtown open space improvements, $6.0 million for Priority 1 neighborhood parks, $4.5 million <br />for neighborhood and community park acquisition, and $6.2 million for site renovations and <br />rehabilitations. <br />Wastewater has proposed to spend $18.7 million on capital projects. Included in these <br />improvements is $14.7 million to preserve and rehabilitate the City's aging wastewater system, <br />$2.3 million to replace the West Irwin Pump Station and $1 million for wastewater services for <br />new development. <br />Airport accounts for $18.4 million of the City's proposed capital spending. Major projects include <br />access control upgrades ($4.2 million), Automated Car Wash and adjacent site improvements <br />($4.0 million total with $1.9 million in this CIP), Taxiway Alpha rehabilitation ($4.0 million), <br />airfield geometry corrections ($3.2 million), and the Terminal building roof replacement ($2.0 <br />million). <br />
The URL can be used to link to this page
Your browser does not support the video tag.