Laserfiche WebLink
Centennial Loop <br />Project Description: This project consisted of rehabilitation of this street in the Harlow Neighbors <br />neighborhood in Council Ward 4: <br />• Centennial Loop from MLK Blvd (east) to MLK Blvd/Club Rd <br />Treatment Methodology: Centennial Loop was rehabilitated by removing the existing pavement <br />and 1 to 3 inches of aggregate base as needed. The street was repaved with 7 inches of asphalt. <br />Costs: Total project costs, from all funding sources, are estimated at $351,900. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $678,000 <br />Total Projected/Actual Paving Bond Funds Used = $347,000 <br />Difference = $331,000 <br />The roadway was anticipated to require full depth reconstruction, but after testing of the existing <br />roadway and underlying soils, the roadway was able to be rehabilitated at less expense. <br />Additional Sources of Funding: Stormwater utility funds <br />Project Photos: <br />Completed Paving Centennial Loop <br />