My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2017 City Council Agenda
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2017
>
03-13-2017
>
03/13/2017 City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:26:29 AM
Creation date
3/10/2017 9:18:58 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
3/13/2017
CMO_Effective_Date
3/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Centennial Loop <br />Project Description: This project consisted of rehabilitation of this street in the Harlow Neighbors <br />neighborhood in Council Ward 4: <br />• Centennial Loop from MLK Blvd (east) to MLK Blvd/Club Rd <br />Treatment Methodology: Centennial Loop was rehabilitated by removing the existing pavement <br />and 1 to 3 inches of aggregate base as needed. The street was repaved with 7 inches of asphalt. <br />Costs: Total project costs, from all funding sources, are estimated at $351,900. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $678,000 <br />Total Projected/Actual Paving Bond Funds Used = $347,000 <br />Difference = $331,000 <br />The roadway was anticipated to require full depth reconstruction, but after testing of the existing <br />roadway and underlying soils, the roadway was able to be rehabilitated at less expense. <br />Additional Sources of Funding: Stormwater utility funds <br />Project Photos: <br />Completed Paving Centennial Loop <br />
The URL can be used to link to this page
Your browser does not support the video tag.