My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2017 City Council Agenda
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2017
>
03-13-2017
>
03/13/2017 City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:26:29 AM
Creation date
3/10/2017 9:18:58 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
3/13/2017
CMO_Effective_Date
3/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following graph identifies the trigger points (PCI) for each treatment based on Functional <br />Class. <br />Project Prioritization <br />Selecting streets or street segments for treatment is done through a process involving analysis, <br />testing, and staff experience. Using the data produced by MicroPaver, and combining this <br />information with estimated revenues allows staff to approximate backlogs and group potential <br />street segments for consideration for treatment under the Pavement Preservation Program. <br />Streets are not prioritized on a "worst first" basis. Public Works' main objective is to keep street <br />segments from slipping into the reconstruction category, which typically costs four to five times <br />more per lane mile than rehabilitation. By rehabilitating (overlaying) a street before it <br />significantly deteriorates, 15 to 20 years of useful life can be added to a street at a substantial <br />cost savings over reconstruction. Once a street has deteriorated to the point that it must be <br />reconstructed, the opportunity for preventive street maintenance (overlay) is lost. For these <br />reasons, streets that are categorized as overlay projects receive the highest priority for corrective <br />treatment. If at some point in the future there are additional funds available, or if the majority of <br />overlay projects have been addressed, reconstruction projects will be scheduled. <br />A prioritized list of 32 street repair projects to be funded by a local bond measure was approved <br />by Eugene voters in 2008. The list, approved by City Council, was developed by staff based on <br />citizen input, information about needed street rehabilitation and reconstruction from the <br />pavement management system, and equitable geographic distribution of projects throughout the <br />14 <br />PCI Treatment <br />Range <br />by Functional <br />Cllass <br />NMI <br />2,122,111"M <br />ANN <br />Ammr16cis�c1 <br />.......................... ............................ <br />.... ................. <br />0 10 20 <br />30 <br />4110 <br />50 <br />60 <br />70 <br />80 <br />90 100 <br />Project Prioritization <br />Selecting streets or street segments for treatment is done through a process involving analysis, <br />testing, and staff experience. Using the data produced by MicroPaver, and combining this <br />information with estimated revenues allows staff to approximate backlogs and group potential <br />street segments for consideration for treatment under the Pavement Preservation Program. <br />Streets are not prioritized on a "worst first" basis. Public Works' main objective is to keep street <br />segments from slipping into the reconstruction category, which typically costs four to five times <br />more per lane mile than rehabilitation. By rehabilitating (overlaying) a street before it <br />significantly deteriorates, 15 to 20 years of useful life can be added to a street at a substantial <br />cost savings over reconstruction. Once a street has deteriorated to the point that it must be <br />reconstructed, the opportunity for preventive street maintenance (overlay) is lost. For these <br />reasons, streets that are categorized as overlay projects receive the highest priority for corrective <br />treatment. If at some point in the future there are additional funds available, or if the majority of <br />overlay projects have been addressed, reconstruction projects will be scheduled. <br />A prioritized list of 32 street repair projects to be funded by a local bond measure was approved <br />by Eugene voters in 2008. The list, approved by City Council, was developed by staff based on <br />citizen input, information about needed street rehabilitation and reconstruction from the <br />pavement management system, and equitable geographic distribution of projects throughout the <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.