My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 53-17-01-F
COE
>
City of Eugene
>
Administrative Orders
>
2017
>
Admin Order 53-17-01-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 2:01:25 PM
Creation date
3/10/2017 1:56:01 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Author
CRO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transferee, or grantee who has been informed of the existence of such a permit, <br />notice, or order shall be bound thereby and shall secure a certificate of occupancy. <br />10.9.2. Transfer of Certificate of Occupancy. The owner of every new <br />building, structure, or new use established in an existing building pursuant to a <br />change of occupancy inspection and review or structural permit, and for which a <br />certificate of occupancy is required, shall not sell, transfer, or grant such property <br />to another without furnishing and thereby transferring the certificate of occupancy <br />to the purchaser, transferee, or grantee. <br />11. Demolition Permits. <br />11.1 Issuance of Permit. No building permit for demolition or work involving <br />demolition of a building shall be issued until the owner or applicant has filed with the <br />permit application a plan indicating the length of time to complete the demolition, whether <br />there will be salvage of material, the manner in which the site will be secured against <br />accessibility by children and other unauthorized persons, and how compliance with <br />Chapter 33 (Safeguards During Construction or Demolition) of the Oregon Structural <br />Specialty Code and this section will be achieved, and has otherwise complied with <br />applicable state and local laws. <br />.11.2 Requirements under the Permit. In addition to complying with the <br />requirements of Chapter 33 of the Oregon Structural Specialty Code and this <br />Administrative Rule: <br />11.2.1. No demolition may be commenced unless written notice has been <br />provided to the properties that are immediately adjacent to or across the street from <br />the property to be demolished at least 48 hours prior to the demolition work; <br />11.2.2. No demolition of the exterior of a structure may take place, and no <br />demolition debris may be moved, when winds exceed 25 m.p.h.; and <br />11.2.3. No demolition may occur by implosion or other explosive means <br />except when a special demolition permit has been issued that expressly authorizes <br />use of implosion or other explosive means and establishes specific conditions that <br />address health, safety and livability concerns. <br />12. Completion. The building demolition for which a permit is issued shall be <br />completed within 60 days of the date of the permit. An extension of time may be granted by the <br />Building Official, provided the demolition is progressing satisfactorily. <br />13. Movine Structures Procedure. <br />13.1 Inspection. Upon payment of an inspection fee, the Building Official shall <br />inspect the house, building, or other structure, and advise the applicant whether or not the <br />same can be moved in accordance with this section. No moving permit shall be issued <br />Administrative Order - Page 32 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.