Laserfiche WebLink
1/3 <br />CityofEugene,Oregon <br />CityHallRefurbishing <br />StatementofProbableCost <br />LOCITEMDESCRIPTIONQNTYUNIT$/UNITTOTAL$ <br />CITYHALLBUILDINGCOMPLEX <br />1,610,446 <br />Seismicupgrades <br />0 <br />SF 909,360 <br />Seismicupgradesfootings/shearwalls/plaster <br />15,156 <br />60.00 <br />SF 481,950 <br />Seismicupgradesdemo/replaceCMUwalls <br />22,950 <br />21.00 <br />EA 124,000 <br />Seismicupgradeswrapcolumns <br />62 <br />2,000.00 <br />LB 95,136 <br />Seismicupgradesstructuralsteel <br />47,568 <br />2.00 <br />0 <br />779,000 <br />Demolition <br />0 <br />SF 380,000 <br />Hazardousmaterialsabatementleadpnt/asbestos/pcb's/cfc's <br />209,300 <br />1.82 <br />SF 399,000 <br />Demolitionx_interiorwalls,finishes,etc. <br />79,800 <br />5.00 <br />0 <br />511,500 <br />Concrete,Carpentry,andSecurity <br />0 <br />PlazaSF 200,000 <br />Pondfeatureremoveandinfill <br />8,000 <br />25.00 <br />PlazaSF 47,500 <br />Paversclean/seal/replaceasreq'd <br />47,500 <br />1.00 <br />LS 50,000 <br />Loadingdockallowance <br />1 <br />50,000.00 <br />LS 20,000 <br />CMUtrashenclosureallowance <br />1 <br />20,000.00 <br />LF 148,000 <br />ExteriorfinsreplacedD-Fir_select_painted <br />13,680 <br />10.82 <br />LF 6,000 <br />Securityfencingchain-lk_12'ht_vinylcoated <br />200 <br />30.00 <br />PR 40,000 <br />Securitygatesmotorizedw/cardreader <br />2 <br />20,000.00 <br />0 <br />1,049,400 <br />Thermal&Moisture <br />0 <br />SF 358,020 <br />Insulationunderslabfurring/rigidinsul/gypbd/vp <br />45,900 <br />7.80 <br />SF 135,405 <br />Insulation@extwallsfurring/rigidinsul/gypbd/vp <br />22,950 <br />5.90 <br />SF 468,000 <br />Roofingsingleply/taperedinsul <br />62,400 <br />7.50 <br />SF 78,000 <br />Sheetmetalflashings <br />62,400 <br />1.25 <br />LedgeSF 9,975 <br />Sealantsonconcreteepoxy <br />2,850 <br />3.50 <br />0 <br />1,014,500 <br />DoorsandWindows <br />0 <br />ExteriorSF 790,000 <br />Windowsalumdblglaz/operablevents <br />10,620 <br />74.39 <br />ExteriorEA 96,500 <br />Doorsalumframe/glazing/hdwr <br />30 <br />3,216.67 <br />CouncilC.SF 128,000 <br />ClerestoryKalwall-insulated <br />1,280 <br />100.00 <br />0 <br />5,466,705 <br />Finishes <br />0 <br />70%ofareaSF 3,175,200 <br />Interiorinfillpackagestandardfinishes <br />52,920 <br />60.00 <br />30%ofareaSF 1,814,400 <br />Interiorinfillpackagecivic-qualityfinishes <br />22,680 <br />80.00 <br />CouncilC.SF 420,000 <br />Interiorinfillpackagecivic-qualityfinishes <br />4,200 <br />100.00 <br />SF 27,000 <br />Ceiling@parkingsuspgrid/heavyduty/firerated <br />6,000 <br />4.50 <br />SF 30,105 <br />Painting,exterior2cts@walls,trim,railings <br />40,140 <br />0.75 <br />0 <br />215,000 <br />Specialties&Equipment <br />0 <br />LS 5,000 <br />Elevator_existingupgrade <br />1 <br />5,000.00 <br />LS 210,000 <br />Elevator_newdemo/excav/pit/2-stop_onedoor <br />1 <br />210,000.00 <br />0 <br />7,535,110 <br />Mechanical&Electrical <br />0 <br />SF 653,956 <br />Firesprinklersriser/piping/heads_wet/dry <br />118,901 <br />5.50 <br />SF 1,458,744 <br />Plumbingpipingandfixtures <br />79,800 <br />18.28 <br />SF 2,915,094 <br />HVACequipment&ductwork <br />79,800 <br />36.53 <br />SF 2,507,316 <br />Electricalpower/lighting/VD/firealarm <br />79,800 <br />31.42 <br />0 <br />18,181,661 <br />HARDCOSTTOTAL <br />ESTIMATEDATE:May8,06 <br />ARCH:HackerCONSTRUCTIONFOCUS,INC.REVISION#:1 <br />DWGDATE:N/A541-686-2031CONST.START:2Qtr-06 <br />DESIGNLEVEL:ConceptualEUGENE,OREGON <br />