1/3
<br />CityofEugene,Oregon
<br />CityHallRefurbishing
<br />StatementofProbableCost
<br />LOCITEMDESCRIPTIONQNTYUNIT$/UNITTOTAL$
<br />CITYHALLBUILDINGCOMPLEX
<br />1,610,446
<br />Seismicupgrades
<br />0
<br />SF 909,360
<br />Seismicupgradesfootings/shearwalls/plaster
<br />15,156
<br />60.00
<br />SF 481,950
<br />Seismicupgradesdemo/replaceCMUwalls
<br />22,950
<br />21.00
<br />EA 124,000
<br />Seismicupgradeswrapcolumns
<br />62
<br />2,000.00
<br />LB 95,136
<br />Seismicupgradesstructuralsteel
<br />47,568
<br />2.00
<br />0
<br />779,000
<br />Demolition
<br />0
<br />SF 380,000
<br />Hazardousmaterialsabatementleadpnt/asbestos/pcb's/cfc's
<br />209,300
<br />1.82
<br />SF 399,000
<br />Demolitionx_interiorwalls,finishes,etc.
<br />79,800
<br />5.00
<br />0
<br />511,500
<br />Concrete,Carpentry,andSecurity
<br />0
<br />PlazaSF 200,000
<br />Pondfeatureremoveandinfill
<br />8,000
<br />25.00
<br />PlazaSF 47,500
<br />Paversclean/seal/replaceasreq'd
<br />47,500
<br />1.00
<br />LS 50,000
<br />Loadingdockallowance
<br />1
<br />50,000.00
<br />LS 20,000
<br />CMUtrashenclosureallowance
<br />1
<br />20,000.00
<br />LF 148,000
<br />ExteriorfinsreplacedD-Fir_select_painted
<br />13,680
<br />10.82
<br />LF 6,000
<br />Securityfencingchain-lk_12'ht_vinylcoated
<br />200
<br />30.00
<br />PR 40,000
<br />Securitygatesmotorizedw/cardreader
<br />2
<br />20,000.00
<br />0
<br />1,049,400
<br />Thermal&Moisture
<br />0
<br />SF 358,020
<br />Insulationunderslabfurring/rigidinsul/gypbd/vp
<br />45,900
<br />7.80
<br />SF 135,405
<br />Insulation@extwallsfurring/rigidinsul/gypbd/vp
<br />22,950
<br />5.90
<br />SF 468,000
<br />Roofingsingleply/taperedinsul
<br />62,400
<br />7.50
<br />SF 78,000
<br />Sheetmetalflashings
<br />62,400
<br />1.25
<br />LedgeSF 9,975
<br />Sealantsonconcreteepoxy
<br />2,850
<br />3.50
<br />0
<br />1,014,500
<br />DoorsandWindows
<br />0
<br />ExteriorSF 790,000
<br />Windowsalumdblglaz/operablevents
<br />10,620
<br />74.39
<br />ExteriorEA 96,500
<br />Doorsalumframe/glazing/hdwr
<br />30
<br />3,216.67
<br />CouncilC.SF 128,000
<br />ClerestoryKalwall-insulated
<br />1,280
<br />100.00
<br />0
<br />5,466,705
<br />Finishes
<br />0
<br />70%ofareaSF 3,175,200
<br />Interiorinfillpackagestandardfinishes
<br />52,920
<br />60.00
<br />30%ofareaSF 1,814,400
<br />Interiorinfillpackagecivic-qualityfinishes
<br />22,680
<br />80.00
<br />CouncilC.SF 420,000
<br />Interiorinfillpackagecivic-qualityfinishes
<br />4,200
<br />100.00
<br />SF 27,000
<br />Ceiling@parkingsuspgrid/heavyduty/firerated
<br />6,000
<br />4.50
<br />SF 30,105
<br />Painting,exterior2cts@walls,trim,railings
<br />40,140
<br />0.75
<br />0
<br />215,000
<br />Specialties&Equipment
<br />0
<br />LS 5,000
<br />Elevator_existingupgrade
<br />1
<br />5,000.00
<br />LS 210,000
<br />Elevator_newdemo/excav/pit/2-stop_onedoor
<br />1
<br />210,000.00
<br />0
<br />7,535,110
<br />Mechanical&Electrical
<br />0
<br />SF 653,956
<br />Firesprinklersriser/piping/heads_wet/dry
<br />118,901
<br />5.50
<br />SF 1,458,744
<br />Plumbingpipingandfixtures
<br />79,800
<br />18.28
<br />SF 2,915,094
<br />HVACequipment&ductwork
<br />79,800
<br />36.53
<br />SF 2,507,316
<br />Electricalpower/lighting/VD/firealarm
<br />79,800
<br />31.42
<br />0
<br />18,181,661
<br />HARDCOSTTOTAL
<br />ESTIMATEDATE:May8,06
<br />ARCH:HackerCONSTRUCTIONFOCUS,INC.REVISION#:1
<br />DWGDATE:N/A541-686-2031CONST.START:2Qtr-06
<br />DESIGNLEVEL:ConceptualEUGENE,OREGON
<br />
|