Laserfiche WebLink
2/3 <br />CityofEugene,Oregon <br />CityHallRefurbishing <br />StatementofProbableCost <br />LOCITEMDESCRIPTIONQNTYUNIT$/UNITTOTAL$ <br />TheaboveHARDCOSTTOTALdoesnotincludetypicalgeneralcontractormarkups. <br />ThosepluscontingenciesarelistedbelowaspartofaLow-HighRange. <br />Variablesincludefluctuationsinmarketconditions,materialselections,anddesignconsiderations. <br />TheCostEstimateRangewillbeconsolidatedaswemoveclosertotheactualBidDate. <br />LOWRANGEHIGHRANGE <br />Markups: <br />@20%:3,636,332Contingency@35%:6,363,581 <br />1,527,259GenRequirements@7%:1,718,167 <br />1,167,263Profit&Overhead@5%:1,313,170 <br />1,225,626LEEDRatingPremium@5%:1,378,829 <br />190,367PerfomanceBond&BOLI:212,723 <br />MarkupSubtotals: <br />7,746,84710,986,470 <br />25,928,507CONSTRUCTIONTOTAL29,168,131 <br />LOWRANGEHIGHRANGE <br />ADAIMPROVEMENTS <br />Allowancefor25%oftheConstructionTotal(HighRange)7,292,033 <br />ALTERNATE <br />Alt#1:EmergencyServicesUpgrade:447,834 <br />(Increasethecostofshearwalls,dragstruts,andelectricalservices) <br />CONSTRUCTION+ADA+ALTERNATETOTAL36,907,998 <br />NOTES <br />Constructionstartdateisassumedtobe2ndquarter,2006 <br />Refertothe"ScopeofWork"formoredetailedinformation. <br />EXCLUSIONS <br />Designfees,permitfees,systemdevelopmentfees,utilityhookupcharges,testing. <br />Inflation,movingexpenses. <br />ESTIMATEDATE:May8,06 <br />ARCH:HackerCONSTRUCTIONFOCUS,INC.REVISION#:1 <br />DWGDATE:N/A541-686-2031CONST.START:2Qtr-06 <br />DESIGNLEVEL:ConceptualEUGENE,OREGON <br />