Laserfiche WebLink
(a) Structured parking. <br /> (b) Broadcasting studios including commercial and public <br /> education. <br /> (c) University and college dormitories. <br /> (d) Fraternities and sororities. <br /> (e) Hospitals. <br /> (f) Retail use requiring a Transportation Impact Analysis. <br /> (g) Manufacturing and assembly uses. <br /> (h) Arenas. <br /> (i) Heliports and helistops. <br /> (j) Recycling and large collection facilities. <br /> (k) Recycling scrap and dismantling yards. <br /> (I) Race tracks, including drag strips and go-cart tracks. <br /> (m) Sewage treatment plants. <br /> (n) Correctional facilities. <br /> (o) Parking lots exceeding 100 spaces. <br /> (p) Service stations. <br /> (q) Mineral resource mining. <br /> (r) Blood banks. <br /> (s) Plasma centers. <br /> (2) Special Use Limitations. Within the/EC East Campus Overlay <br /> Zone, camping is permitted for a maximum of 2 continuous <br /> days only when directly tied to a special event permit held for <br /> the location of the camping site. A special event permit <br /> approving camping is required by the City to ensure minimal <br /> impact on the surrounding neighborhood. <br /> <br />9.4220 /EC East Campus Overlay Zone Development Standard~. <br /> (1) Application of Standards. The General Standards for all <br /> Development in EC 9.6000 through EC 9.6885, the special <br /> standards for specific uses in EC 9.5000 through EC 9.5850, as <br /> weft as all development standards in the appftcable base zone <br /> apply within this overlay zone, including triggers for Traffic <br /> Impact Analysis and Site Review for certain uses in the PL <br /> zone. In the event of a conflict between the development <br /> standards, the specific provisions of EC 9.4215 and 9.4220 <br /> shaft control The standards in this section only apply to: <br /> (a) New development on vacant land. <br /> (b) New structures on redevelopment sites, such as <br /> conversion of a parking area to a building or demolition <br /> of a building and construction of a new building. <br /> (c) A proposed expansion of 30% or more of the total <br /> existing structure square footage. <br /> <br />Ordinance - 24 <br />C:\Documents and Settings\cepladl\Local Settings\Temporary Internet Files\OLKA\Fairmount UofO SAS <br />Ordinance (00071961 )2.DOC(02/24/04) <br /> <br /> City Council Agenda page 220 <br /> <br /> <br />