Laserfiche WebLink
<br />At the April 26, 2006 work session, the council adopted three Police consolidation options for <br />use in ongoing planning efforts related to the City Hall Complex: Option B that consolidates all <br />Police functions with the rest of City Hall on a single site; Option C that consolidates all Police <br />functions except patrol with the rest of City Hall and provides for a separate patrol facility <br />nearby; and Option D that consolidates all Police functions except patrol with the rest of City <br />Hall and provides for a separate patrol facility in a more remote location outside the downtown <br />area. <br /> <br />At the July 19, 2006 work session, the council adopted new construction as the preferred option <br />for future planning and design of the City Hall Complex rather than renovating the existing city <br />hall building or doing a hybrid of renovation and new construction. <br /> <br />Then at the September 20, 2006 work session, the council selected two sites for which concep- <br />tual design options will be developed for a new Eugene City Hall. <br /> <br />L:\CMO\2006 Council Agendas\M061018\S061018A.doc <br />