My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: Proposed Modifications to the Parks Systems Development Charge Methodology and Rates
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 10/25/06 Work Session
>
Item B: Proposed Modifications to the Parks Systems Development Charge Methodology and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:15:47 PM
Creation date
10/19/2006 10:45:08 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
10/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT C <br /> <br />SPPSDCME <br />UMMARY OF ROPOSED ARKS ETHODOLOGY LEMENTS <br /> <br /> <br />Methodological Issue Approach Used RAC Response <br />Cost Basis <br />General capacity analysis Base relative system capacity needs for growth and existing Majority support <br />users on the planned Level of Service (LOS) as opposed to <br />exiting LOS <br />Type(s) of parks to include in SDC Include all park types in the SDC cost basis Majority support <br />UGB analysis Include projects outside the UGB in the SDC cost basis Majority support <br /> <br />Project list and LOS approach Base the SDC analysis for each park and improvement type on Majority support* <br />the entire project list (with the exception of priority 5 projects) <br />Park acreage capacity analysis and <br />cost allocation <br />- System-wide vs. individual park Base project list cost allocations on a system-wide LOS Majority support <br />service area analysis analysis (as opposed to a park-by-park basis) to determine <br />relative park capacity needs <br />- Park type analysis Base project list cost allocations on a capacity analysis by park Majority support <br />type <br />- Land acquisition and development Analyze land acquisition and development costs separately for Majority support <br />analysis purposes of project cost allocations <br />Facilities capacity analysis and cost <br />allocation <br />- Type(s) of facilities to include in - Include outdoor recreation facilities standard to the selected Majority support <br />SDC park types, unless funded primarily through user fees (e.g., <br />golf courses) <br />- Include standard natural area amenities, unless funded <br />through other sources (e.g., off-street bike paths) <br />- Allocation basis Allocate outdoor recreation facilities based on an individual LOS Majority support <br />analysis for each specific facility type <br />- Special use facilities analysis Allocate land development and acquisition costs based on Majority support <br />growth’s share of total future population; this differs from LOS <br />approach for all other park types <br />Cost basis adjustments <br />- Exclude projects or portions of projects that are (a) identified as Required by <br />Improvement fee <br />“renovation” in the CIP, and/or (b) estimated to be funded statutes <br />through other city or non-city funds <br />- Adjust the SDC cost basis to account for historical grants and Required by <br />Reimbursement fee <br />contributions statutes <br />Fee Structure <br />Reimbursement and/or improvement Include both improvement and reimbursement components Majority support <br />fee analysis <br />Fee Assessment <br />Residential SDC assessment - Differentiate between residential dwelling types based on Majority support <br />available census data on number of persons per dwelling unit <br /> <br />- Aggregate dwelling unit types into three groups <br />- Include accessory dwelling units in the same category as <br />attached one-unit dwellings and two-unit dwellings <br /> <br />*While not a direct SDC issue, members of the RAC expressed concern with the impact of neighborhood park land <br />acquisition, as reflected in the entire project list, on residential land supply. <br />,SPME P12 <br />ATTACHMENT C UMMARY OF ROPOSED ETHODOLOGY LEMENTS AGE OF <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.