My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: Proposed Modifications to the Parks Systems Development Charge Methodology and Rates
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 10/25/06 Work Session
>
Item B: Proposed Modifications to the Parks Systems Development Charge Methodology and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:15:47 PM
Creation date
10/19/2006 10:45:08 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
10/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A1() <br />TTACHMENT CONTINUED <br />Methodological Issue Approach Used RAC Response <br />Fee Assessment (cont.) <br />Nonresidential SDC assessment <br />- Policy direction Pursue imposition of park SDCs on industrial, commercial, and N/A <br />office uses, in accordance with the City Council’s unanimous <br />support (on April 28, 2003) of a motion that directs the City <br />Manager to do so <br />- Cost allocation Develop an SDC for nonresidential development using a 16.4% Majority support** <br />allocation of SDC costs to nonresidential land uses, based on <br />park survey data <br />- Fee assessment - Establish “equivalent population” as the basis of system-wide Majority support <br />unit costs to include <br /> <br />hotel/motel in <br />- Establish four nonresidential classes <br />residential <br />- Use survey data to allocate a percent of park usage to tourist <br /> <br />category <br />accommodation rooms <br />- Use employment density to assign costs to other <br />nonresidential developments <br />Revenue Offsets/Credits <br />Include an existing deficiency credit to recognize potential future Majority support <br />Existing deficiency credit <br />contributions by newly developed properties through property <br />taxes used to fund capital projects to increase the LOS for <br />existing park users <br />Implementation/Updating <br /> <br />Annual land and construction cost - Continue to apply ENR 20-City National average CCI to Majority support <br />construction cost component of proposed improvements <br />update <br /> <br /> <br />- Use index produced yearly by Lane County Assessment & <br />Taxation office to measure changes in price of land <br />- Within the Sales Ratio Report, use the residential lands <br />category of the area best representing the Eugene UGB to <br />determine the land index value <br />- Word the adopted land cost index in a manner to recognize <br />that the County Assessor may change geographic boundaries <br />used for tax assessment analysis purposes <br />Project list updates Conduct ongoing review of the Project List, with the CIP Majority support <br />process, to determine whether project expenditures are on <br />track, and update Project List and/or SDC accordingly <br />SDC methodology review process Include a review process; if review yields a material change in Majority support <br />the SDC, then update the SDC outside of the comprehensive <br />methodology review <br /> <br />** RAC support for this allocation method was for purposes of further evaluation of a nonresidential component; a <br />majority of the RAC disagreed with the inclusion a nonresidential SDC, with the exception of including hotel/motel in <br />the residential category. <br />,SPME P22 <br />ATTACHMENT C UMMARY OF ROPOSED ETHODOLOGY LEMENTS AGE OF <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.