<br />-- ~
<br />61
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />- - -- -
<br />- - - ---- - -
<br />
<br />Council Chambers
<br />October 27, 1947
<br />Eugene, Oregon
<br />
<br />
<br />II Minutes of the regular meeting of the Common Council of Eugene held October 27, ,::
<br />1947 at 7:30 P.M. The meeting was called to order by his Honor, Mayor Earl McNutt. ~:;'
<br />Counci Imen present a t rollcall were - Crwnbaker, Ba iley, Johnson" Allen, Wells, ",',
<br />and Pennington. Hawn and Davis absent.
<br />
<br />Upon motion the minutes of the last regular meeting held October 14, 1947,
<br />were considered read and approved.
<br />
<br />1_, The City Manager presented for Council consideration the following bid on the
<br />construction of buildings at the Swimming Pool site, which had been publicly
<br />opened Friday, October 24, 1947 and scheduled as follows:
<br />
<br />Frye-Schilling Co.
<br />1 Rt. 2, Box 309A
<br />Eugene, Oregon
<br />
<br />Excavation: Unit Bid No. Total
<br />Structural $ 6.00 per cu. yd. 225 $1,350.00
<br />Trench 4.00 per cu. yd. 90 360.00
<br />Compacted Backfill 2.50 per cu. yd. 560 1,400.00
<br />
<br />Concrete:
<br />Class "A" Floor Slabs & Decks 27.00 per cu. yd. 170 4,590.00
<br />Class "A" Walls, Roof Slabs, Filters,
<br />etc., requiring special forms 65.00 per cu. yd. 175 11,375.00
<br />Class "B"" Walkways 27.00 per cu. yd. 94 2,538.00
<br />(Alt.,) .Asphaltic Walkways 2.00 per sq. yd. 840 1,680.00
<br />Class "B" Curbs 35.00 per cu. yd. 45 1,575.00
<br />EXfansion Joint Material .40 per line ft. 1,250 500.00
<br />Furnishing & Installing)
<br />Reinforcing Steel .12 per lb. 33,000 3,960.00
<br />(Furnishing & Installing)
<br />I Structural Steel .50 per lb. 3,000 1,500.00
<br />(Furnishing & Installing)
<br />Install all Piping, Fittings, Specials
<br />and Valves. 1,350.00
<br />Install all 4", Ii", 1" and 3/4" G.I.
<br />Pipe, Fittings, Hose Bibs, and Valves 374.00
<br />Install Hair & Lint Catcher, Throttling
<br />Valve, Rate of Flow Controller & Re-
<br />circulation pump 385.00
<br />Install Filter Gravel & Sand 100.00
<br />Install all Power Wiring 242.00
<br />Install Exterior Flood Lighting 1,105.00
<br />Install all Building Wiring 679.25
<br />Install all Plumbing & Fixtures 1,704.00
<br />Install Heating System 3,681.70
<br />Furnish & Install Wire Fence 2,325.00
<br />Furnish & Install 4'x9' Gates 150.00
<br />Furnish & Install 10' x 9~ Gates 105.00
<br />Furnish & Install 4' Fence 633.70
<br />Install 5 tier Bleachers 500.00
<br />Install 4 tier Bleachers 300.00
<br />Furnish & Place Brickwork in Stack 1,540.00
<br />& Entry Facing
<br />Furnish & Install Base Rock & Bituminous
<br />Concrete in Roadways & Parking Areas 2.00 pe~ sq. yd. 3,385 6,770.00
<br />I Furnish & Install Crushed Rock &
<br />Bituminous Concrete in Walks, Bicycle
<br />and Bleacher Area. 1.75 per sq. yd. 1,260 2,205.00
<br />Furnish & Install Glass Blocks 85.00
<br />Furnish & Install 15 Year Roofing
<br />including Roof Flashing & Parapet
<br />Top Board 1,600.00
<br />Furnish & Install 15 Year Roofing
<br />excluding Parapet Top Board & Flashing 1,300.00
<br />I Furnish & Apply One Primer Coat & One
<br />Finish Coat of Roofing Asphalt Water
<br />- Proofing to Roof Slab & Inside Parapet Wall 500.00
<br />Furnish & Install Roof Ventilators 460.00
<br />Furnish & Install All Sash 894.00
<br />Furnish & Install All Doors 381.25
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />~
<br />
|