<br /> ~62 "
<br /> _ u_ .... . _.< - ' . - - - - - " . -- - -. - -- _ _. H' ___ _ _ 0_. _ ._ _' ._ - , - ' u . '
<br /> - - -- '.'- _._- .- - ... - '-."
<br /> - ~_._._- -.-. - -- , , . _. - - ," . -. - - - -- . '.-. -." -- - -. - - ~ '- -. ','~".- '1r.'-" 0' ..,- - - ..
<br /> - -- '. - - .... . - -.- - -- - .. - - !:
<br /> "
<br /> II
<br /> .'
<br /> Furnish & rnstall All Structural #1 I:
<br /> ,I
<br /> I: I
<br /> Grade Common & Clear Trim Lumber for t
<br /> " '. ~ Carpent,ry Work $5,.769.00 ;
<br /> "
<br /> -;.., ;. Install Metal Dressing 100'.00 1
<br /> , .,.. :
<br /> Furnish & Install 3/16" Asphaltic Tile . . k
<br /> ~ on Floor in Entry & Office' . - , ' ~ . .. , ., . , -., ,- ': ;250'~UO' I'
<br /> . .. "
<br /> ('Y Furnish & Install Cement Plaster Work . l:
<br /> .'
<br /> in Shower Rooms 925.00 II
<br /> !r
<br /> Eurnish & Apply Paint to All Exposed ~
<br /> ,
<br /> '.
<br /> Concrete & Cement Plaster Surfaces I.
<br /> "
<br /> -
<br /> within Building 594.0'0 I
<br /> Furnish & Apply Paint to all Woodwork
<br /> wi thin Building : 350.0'0'
<br /> Furnish All Paint & Patnting All ,
<br /> Exposed Piping, Fittings, Valves, Pumps
<br /> and Equipment, In Equipment Room with .- I;
<br /> -
<br /> Two Coats of Metal Protective Paint. 3.00.-0'0
<br /> Installing Name Plate ,100'.0'0'
<br /> J
<br /> . , . TOTAL $65,105.90 !:
<br /> . . . 0 . . :'
<br /> "
<br /> It was moved by Crumbaker, seconded by .Johnson that the bid of Frye-Schilling "
<br /> "
<br /> C.o. b,e rejected. Motion carried. . ;1
<br /> 2 A report from the City Manager re: Swimming Pool bid was submitted and read as:'
<br /> fool 1 o,ws : . 0 0 !
<br /> I,
<br /> ,
<br /> I
<br /> . ":1 beg to report. tha.t one bid .was received and scheduled on O'ctober 24th for
<br /> the s,econd and final un1t of the Eugene Memorial Swimming Pool Project. This bid .,
<br /> was ~ubmitted by Fry.e-Schilling Company of Eugene in the sum of $65,10'5.90.- ,I
<br /> 0 . . . 11
<br /> 0 This bid is in .excess of, the founds available for the completion of the project "
<br /> and under these circumstances, I recommend that the matter be referred back to the "
<br /> C.ity.Manager a;nd consult.ing engineers for a further analysis of specifications and ;1
<br /> :'
<br /> with authority to re-advertise for bids at a~ter date." 1
<br /> . : 0 . -
<br /> "
<br /> It was moved by .Johnson, seconded by Crumbaker that the report of the ~mnager be I:
<br /> received and placed on file. I'
<br /> 0 : .
<br /> REPORTS O'F COMMITTEES : , ,
<br /> . , .'
<br /> A report of the Public Works Committee re: opening of the.alley between Van il
<br /> 3 Buren and Tyler and 8th Avenue West and West- Broadway, was submitted and ~ead as ,;
<br /> f.ollows: ,
<br /> '.
<br /> .
<br /> . "Your Committee on Public Works to whom was referred the matter of alley I
<br /> open~ng between Van Buren & Tyler and 8th Avenue West and West Broadway, begs to ;.
<br /> r.eport as follows:
<br /> "
<br /> i,
<br /> . 1,. The area of the proposed alley contains telephone and electric poles and a .'
<br /> s.ewer:, including a man hole.
<br /> .
<br /> . 2. It is to the interest of the City to have the 'area :dedicated as an alley.
<br /> .
<br /> . 3. )There is no justification for the City to spend funds for land for the
<br /> a~ley.
<br /> .
<br /> 4. The City should be alert to protect its rights which accrue from the
<br /> existence of the sewer and the electric light poles in the area. In no case should I
<br /> iot to;Lerate construc,tion. which might interfere wtth either the sewer or the electric 1<
<br /> utility." ~
<br /> ,
<br /> It wa~ moved: by Crumbaker, seconded by Johnson that the report. be received and "
<br /> I'
<br /> placed on file and that the recommendations contained therein be approved. Motion I:
<br /> carried. I.
<br /> '.
<br /> ':
<br /> It wa~ further moved by Crumbaker, seconded by Johnson that the City Manager be
<br /> instructed to continue negotiations for purchase of property necessary to open ,:
<br /> alley. ' Motion carried. I
<br /> ,
<br /> ~
<br /> A report of the Public Works Commi~tee re: .opening of 24th Avenue Eas;t between;j
<br /> 4 Alder and Harris, was submitted and read' as follows:' r .. - .' ~
<br /> I'
<br /> 0 e
<br /> . "Your Committee on Public Works to whom was referred the matter of the opening 1:
<br /> of 24th Avenue East between Alder and Harris, begs to report as follows:
<br /> :
<br /> :1
<br /> ':
<br /> I'
<br /> 'I
<br /> ~;
<br /> r
<br /> "
<br /> "
<br /> I
<br /> l
<br />
|