My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/24/1948 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1948
>
05/24/1948 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 3:08:58 PM
Creation date
11/2/2006 3:15:02 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
5/24/1948
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~170 <br /> <br />- ~-,: <br /> <br />ICENTRAL HEAT I NG <br />$3981.99 <br /> <br />COMPANY <br /> <br />INTER-CITY SAND AND GRAVEL <br />$3263.80 <br /> <br />ACME CONSTRUCTION COMPANY <br />$3131.00 <br /> <br />IT WAS ~OVtD BY CRUMBAKER AND SECONDED BY HANNS THAT THE aiD OF ACME CONSTRUCTION CO~~~NY IN THE <br />,-',Jot'SUM OF' 83131.00, BEING THE: BEST AND LOWEST BID SUBMITTED, THAT THE PROPER C'ITY OFFICERS BE INSTRUCT!D <br />~. TO ENTER INTO A C6NJRACT ~ltH THE ACME CONSTRUCTION COMPA~Y FOR tHE IMPROVEMENt'OF A(~~6EN ST~EEt FROM <br />~~~' 7TH TO 8TH AVENUE. ROLLCALL - ALL COUNCILMEN PRESENT VOXING AYE. ALLEN ABSENT. MOTION CARRIED. <br />""3 <br />o <br /> <br />I <br /> <br />6~ PAVING ALLEY BEtWEEN FERRY AND PATTERSON STREET FROM 11TH TO 12TH AVENUE <br />lin ASPHALT Top, 3in ASPHALT BASE AND j" (I~ MINUS) CRUSHED ROCK <br /> <br />CENTRAL HEATING COMPANY <br />$2109.59 <br /> <br />INTER-CITY SAND AND GRAVEL <br />$ I 8 1 5'.90 <br /> <br />ACME CONSTRUCTION COMPANY <br />$1714.30 <br /> <br />I <br /> <br />(ALTERNATE #1) 6" CONCRETE PAVEMENT <br /> <br />82444.70 <br /> <br />IT WAS MOVED BY. CRUMBAKER AND SECONDED BY HAWN THAT THE BID OF THE ACME CONSTRUCTION COMPANY, <br />IN THE SUM OF $1714.30 BEING THE BEST AND LOWEST BID. SUBMITTED, THAT THE PROPER CITY OFFICERS BE IN- <br />rTRUCTEO TO ENTER INTO A CONTRACT WITH THE ACME CONSTRUCTION COMPANY FOR THE IMPROVEMENT OF THE ALLEY .j <br />IBETWEEN PATTERSON AND HILYARD STREETS FROM EAST, BROADWAY TO THE MILLRACE.IF A SATISFACTORY BID IS MADE <br />ON TREE REMOVAL. ROLLCALL - ALL COUNCILMEN PRESENT VOTING AYE. ALLEN ABSENT. MOTION CARRIED. <br /> <br />7. I~i~ AVENUE' FROM LAWRENCE TO WASHINGTON STQEET <br />2n ASPHALT SURFACING - 6" CRUSHED ROCK GRAVEL BASE <br /> <br />t <br /> <br />~ENTRAL H~ATING COMPANY <br />$3842.32 <br /> <br />INTER-CITY SAND AND GRAVEL <br />$3595.10 <br /> <br />ACME CONSTRUCTION COMPANY <br />83439.35 <br /> <br />(ALTERNATE #1) 6nAsPHALT,IC BASE.- CURB AND GUTTER <br /> <br />$4751.62' <br /> <br />~.,.. -. <br /> <br />84683.50 <br /> <br />$4244.50 <br /> <br />SUM <br />I <br />~O ENTER <br />RENCE TO <br />I <br />CARR~ED. <br /> <br />IT WAS MOVED BY CRUMBAKER AND SECONDED BY HANNS THAT THE BID OF ACME CONSTRUCTION COMPANY IN THE <br />OF $3439.35, BEING THE BEST AND LOWEST BID SUBMITTED, THAT THE PROPER CITY'OFFICERS BE I~STRWCTED <br />INTO A CONTRACT WITH THE,ACME CONSTRUC~ION COMPANY FOR IMPROVEMENT OF 15TH AVENUE FROM LAW- <br />WASHINGTON STREET. ROLLCALL - ALL COUNCILMEN PRESENT VOTING AYE. ALLEN ABSENT. MOTION <br /> <br />I <br /> <br />\ , <br /> <br />8. 18TH AVENUE EAST FROM FERRY TO PATTERSON STREET <br />2" ASPHALT SURFACING - 6" CRUSHED GRAVEL BASE <br /> <br />CENTRAL HEATING <br />I 84325.32 <br /> <br />( A L T ERN A T Ei # 1 ) <br />I.: , <br />856 1 0 . 9,0 <br /> <br />COMPANY <br /> <br />INTER-CiTY.SAND ANO GRAVEL <br />$4044.45 <br /> <br />ACME CONSTRUCTION-COMPANY <br />$3802.75 <br /> <br />6n ASPHALTIC BASE - CURB AND GUTTER <br /> <br />$500~.40 <br /> <br />$4769..10 <br /> <br />IT WAS MOVED BY CRUMBAKER AND SECONDED BY HAWN THAT THE BID OF THE ACME CONST~UCTION COMPAN~ <br />rN THE SUM OF $3802.35, B~ING THE BEST AND LOWEST BID SUBMITTED, THAT THE PROPER CITY OFFICERS BE <br />~NSTRUCTED TO ENTER INTO A CONTRACT WITH THE ACME CONSTRUCTION COMPANY FOR IMPROVE~ENT OF 18TH AV~NU~ <br />I .. <br />IfAST .FROM fE~RY TO 'PATTERSON S:rREET. ROLLCALL:- .ALL COUNCILMEN, PRESENT VOTING AYE,. ALLEN ABSENT. <br />~OTION CARRIED.- . <br /> <br />9. HARRIS PLACE <br />ASPHALTIC CONCRETE PAVEMENT WITH GUTTER AND SIDEWALKS <br /> <br />CENTRAL HE~TING COMPANY <br />$3305.85. <br /> <br />.. \. <br /> <br />INTER-CITY SAND AND GRAVEL <br />$2674.65 <br /> <br />ACME CONSTRUCTION COMPANY <br />$2728.40 <br /> <br />IT, WAS MOVED BY HAWN AND SECONDED BY HANNS THAT THE BID OF THE INTER-CITY SAND AND GRAVEL COMPANY <br />IN TH& SUM OF S2674.65~ BEING THE BES~AND LOWEST BID SUBMITTED, THAT THE P~OPER CIT~ OFFICERS BE IN- <br />~TRUCTED TO ENTER INTO A CONTRACT wiTH THE INTER-CITY SAND AND GRAVEL COMPANY tOR THE IMPROVEMENT OF <br />11 <br />HARRIS PLACE. ROLLCALL - ALL COUNCILMEN PRESENT VOTING AYE. ALLEN ABSENT. MOTION CARRIED. <br /> <br />I <br /> <br />REPORTS OF OFFICERS <br /> <br />2. THE CITy:EN.GINEER SUBMITTED THE FIRST MONTHLY ,AND FINAL ESTIMATES ON THE FOLLOWING IMPRO'VEMENTS: <br /> <br />I. CONCRETE SIDEWALK - KINCAID STREET, 27TH TO ~8TH <br />2. CONCRE~E SIDEWALK - KINCAID STREET, 27TH TO 28TH <br />3. S.WIMMING POOL-FIRST MONTHLY PAYMENT ,..; STEIN BROS. <br /> <br />$82.50 <br />95~00 <br />7238.60 <br /> <br />I <br /> <br />THE RE,PORTS AND ESTIMATES BEING IN PROPER FORM AND CERTIFIED BY THE CITY ENGINEER AND CONTRACTORS,: <br />lIT WAS MOVE.D'., BY CRUMBAKER AND ,SECONDED BY HAWN THAT THE REPORT OF THE CITY ENGINEER BE RECEI.vED AND <br />PLACED ON FILE, AND PROPER 'C.IT'Y OFFICERS BE AUTHORIZED TO DRAW WARRANTS IN PAYMENT TO THE CONTRACTORS <br />~S SHOWN.. :UPON ROL~LCALL NOTE, ALL COUNC.ILMEN PRESENT VOT ING AYE'. ALLEN ABSENT. MOTtO.N CARRIED. <br /> <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.