My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/1950 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1950
>
01/23/1950 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 1:56:10 PM
Creation date
11/2/2006 3:17:32 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
1/23/1950
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />~ <br /> <br />I <br /> <br />.-,- <br /> <br />"A MEETING WAS HEL'D AT 6:00 P.M. IN THE EUGENE HOTEL, JANUARY 16, 1950 TO REVIEW THE <br />PROPOSED AMAZON PROJECT THROUGH THE CITY OF EUGENE WITH THE FOLLOWING PRESENT. MAYOR <br />JOHNSON, COUNCIL-ME'N CRUMBAKER, GODLOVE, SMITH, WELLS, DAVIS AND HAWN; CITY MANAGER; CITY <br />ATTORNEY; CITY RECORDER; CITY ENGINEER; DEANE SEEGER; STANLEY E. SPORSEENE, PRINCIPAL <br />ENGINEER, AND SIGURD HALVORSON, ENGINEER FROM THE ARMY ENGINEERS IN PORTLAND. <br /> <br />MR~ frPORSEENE, PRINCIPA~ ENGINEER OF THE ARMY ENGINEERS EXPLAINED THE RE-SURVEY BEING <br />MADE OF THE ENTIRE AMAZON PROJECT AND HIS INTENTION OF RECOMMENDING THAT THE ARMY ENGINEERS <br />PURCHASE THE RIGHT-OF-WAY FROM THE DIVERSION STRUCTURE, WEST. <br /> <br />. THE TYPE OF CHANNEL IMPROVEMENT FOR THE AMAZON WITHIN THE CITY LIMITS WAS DISCUSSED <br />PERTAINING PARTICULARLY TO THE RELATIVE MERITS OF THE INSTALLATION OF EITHER A METAL ARCH <br />CULVERT UPON CONCRETE FOUNDATIONS OR A CONCRETE ARCH FROM 19TH STREET TO THE FAIRGROUNDS; <br />ALSO THE INSTALLATION OF VERTICAL CONCRETE WALLS AND SLOPING CONCRETE WALLS AND THE ADVAN- <br />TAGES OR DISADVANTAGES PERTAINING TO EACH OF THESE INSTALLATIONS. <br /> <br />IT WAS BROUGHT OUT, THAT THE AMAZON WAS DRAINING AN AREA OF 6,235 ACRES OF WHICH <br />APPROXIMATELY 3,250 WERE OUTSIDE OF THE CITY OF EUGENE ON THE SOUTH AND WEST AND APPROXI- <br />MATELY 2,985 ACRES WITHIN THE CITY OF EUGENE AND THAT THE RUN-OFF FROM OUTSiDE OF THE CITY <br />WAS INCURRED LARGELY FROM STEEP HILLSIDE SLOPES. BASED UPON THE ABOVE FIGURES IT WAS <br />RECOMMENDED TO THE ARMY ENGINEERS PRESENT THAT FEDERAL PARTICIPATION BE SET UPON A FIFTY- <br />FIFTY BASIS WITH T'HE-CITY OF EUGENE FOR THE ENTIRE PROJECT WITHIN THE CITY. <br /> <br />PARTICULAR EMPHASIS WAS PLACED ON THE SIZE AND-CAPACITY OF THE AMAZON STRUCTURE WITH <br />RELATION TO FUTURE PEAK FLOODS, AND ASSURANCE WAS GIVEN'THAT WHICHEVER DESIGN WAS FINALLY <br />SELECTED WOULD AFFORD CAPACITY TO CARRY THESE FLOODS IN A SATISFACTORY MANNER THROUGHOUT <br />/ <br />THE CITY. <br /> <br />I <br /> <br />IT WAS BROUGHT OUT BY MR. SPORSEENE THAT THE ARMY ENGINEERS WOULD LIKE TO HAVE A <br />DEFINITE RECOMMENDATION ON THE DESIRES OF THE CITY ON OR ABOUT JANUARY,24TH, AT WHICH TIME <br />THEY HAVE SET THEIR PUBLIC HEARING. MR. SPORSEENE AGREED TO MEET AGAIN WITH THE COUNCIL <br />AND PRESENT FIVE ALTERNATIVE PLAN~, 'RE~ATIVE COSTS AND RECOMMENDATIONS'AT ,A MEETING SET <br />FOR I I :00 A.M. JANUARY 24TH AT THE CITY HALL. THE ABOVE FIVE ALTERNATIVES TO BE PRESENTED <br />BY THE ARMY ENGINEERS ARE AS FOLLOWS: <br /> <br />I. OPEN CHANNEL WIT.H DIRT BOTTOM AND SIDES. <br /> <br />2. OPEN CHANNEL WITH CONCRETE BOTTOM AND VERTICAL CONCRETE WALLS. <br /> <br />3. OPEN CHANNEL WITH CONCRETE BOTTOM AND SLOPING CONCRETE'SIDES. <br /> <br />4. CLOSED CHANNEL WITH CONCRETE"BOTTOM, TWO-FOOT CONCRETE'SIDES SUPPORTING METAL <br />ARCH PLATE CULVERT. <br /> <br />5. CONCRETE BOTTOM, CONCRETE SIDES AND CONCRETE ARCH." <br /> <br />"I. COUNCIL AUTHORIZATION IS NECESSARY TO CALL OUTSTANDING DISTRrCT'IMPROVEMENT FUND <br />WARRANTS IN THE AMOUNT OF"$40,319.42 ISSUED TO F. W. RIDDLE FOR THE SOUTH <br />WILLAMETTE TRUN.K LINE SEWER. IT IS RECOMMENDED THAT MONEY IN THE 5-MILL SEWER <br />FUND BE USED FOR THIS PURPOSE (PRESENT CASH BALANCE $54,883.32) TO BE REPLACED <br />FROM FUTURE SEWER ASSESSMENTS IN THIS DISTRICT. PLANS ARE TO INSTALL LATERALS <br />FROM 24TH TO 34TH (WHERE ABUTTING PROPERTY WILL JUSTIFY ~SSESSMENT) DURING THE <br />SUMMER OF 1950 AND ASSESSMENTS MADE AS SOON AS POSSIBLE THEREAFTER. THERE WILL <br />STILL REMAIN THE AMOUNT OF $41,629.97 TO BE PAID AS T~E CiTY'S SHARE OF THE <br />WEST SIDE SEWERS WHEN 'FUNDS 'ARE AVAILABLE IN THE 5-MILL SEWER FUND. <br /> <br />I <br /> <br />2. CURRENT INVESTlGATlON'OF"THE WEST SIDE SEWERS IS BEING MADE TO DETERMINE SOURCE <br />OF GROUND WATER AND RECOMMENDATIONS NECESSARY TO CORRECT THE SITUATION. INCLUDED <br />HEREWITH IS LETTER ON PROGRESS BEING MADE BY THE ENGINEERING DEPARTMENT AND AtSO' <br />LETTER FROM JOHNW. CUNNINGHAM & ASSOCIATES. <br /> <br />3. FINANCIAL RECAPITULATION JANUARY I, 1950. THE END OF THE FIRST SIX MONTHS <br />'OPERATION~ UNDER THE 1949-5D BUDGET SHOW ALL DEPARTMENTS WITHIN THE BUDGET OR <br />VERY CLOSE. TOTAL DEPARTMENTAL EXPENDITURES ARE $13,949.73 UNDER THE BUDGET <br />FOR THE FIRST HALF OF 1949-50 FISCAL YEAR. <br /> <br />1- <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.