My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/22/1950 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1950
>
05/22/1950 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 3:06:50 PM
Creation date
11/2/2006 3:18:11 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
5/22/1950
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r2uo <br /> <br /> <br />2. THE PETITION PR'EVIOUSLV PRESENTED BY MR. J..E. EARLEY AND EIG'HT BUSINESSMEN ON PEARL <br />STREET REQUESTING THAT TWO-WAY TRAFFIC BE REPLACED ON 'PEARL STREET WAS CONSIDERED. A.TER <br />CONSIDERABLE DISCUSSION PERTAINING TO TH1S REQUEST IT WAS RECOMMENDED THAT TRA.FIC COUNTS <br />BE TAKEN AND FuTURE STUDY BE GIVEN WITH PARTICULAR NOTE OF THE FUTURE FERRY STREET TRA.FIC <br />WHICH WILL BE DIRECTED TO PEARL STREET FROM THE NORTH SIDE'O. THE RIVER. <br /> <br />, " <br /> <br />3. A PETITION PREVIOUSLY SUBMITTED BY NINE PROPERTY OWNERS CONSTITUTING 52.09% OF THE <br />PROPERTY BETWEEN 11TH AND 13TH AVENUE GN WILtAMETTt REQUESTING THE WIDENING OF WILLAMETTE <br />STREET BETWEEN 11TH AND 13TH TO THE WIDTH OF 50 .EET .ROM CURB TO CURB WAS REVIEWED BY <br />THE COMMITTEE AND HELD OVER FOR FURTHER STUDY WITH THE RECOMMENDATION THAT THE PROPERTY <br />OWNERS INVOLVED GET TOGETHER IN A UNIFIED EFFORT FOR THE IMPROVEMENT 0. THIS-STREET. <br /> <br />4. A REVIEW OF THE PRESENT STATUS 0. THE AMAZON PROJECT WAS GIVEN BY THE CITY MANAGER, <br />EXPLAINING THAT THIS PROJECT WAS NOW IN THE HANDS 0. COLONEL O. E. WALSH, DISTRICT ENGINEER <br />OF THE U. S. ARMY ENGINEERS AND THAT COLONEL WALSH HAD STIPULATED THAT HE WOULD HAVE CONCRETE <br />RECOMMENDATIONS AS TO THE AUAZON PROGRAM FOR THE COUNCIL MEETING MAY 22ND. <br /> <br />IN CONNECTION WITH THE AMAZON PROJECT, UNDER DATE OF MAY 9, 1950 THE ARMY ENGINEERS <br />ADVISED THAT THEY ~AD RAISED THE.DESIG~ FLOOD FLdw AT THE BRIDGES TO 1470 SECO~D .FEET WITH <br />A.CLEAR WATER WA.Y A'REI( OF 154 SQUARE FEET. ,IN'COMPLlANCE WITH THIS.LARGER DESIGN FOR THE <br />ENTIRE AMAZON PROJECT, THE ARMY ENGINEERS ADVISED THAT THE BRIDGES INSTALLED LAST FALL AT <br />19TH AND CHAMBERS STREET WERE LARGE ENOUGH TO MEET THESE REQUIREMENTS BUT THAT THE PROPOSED <br />METAL ARCH CULVERT DESIGN FOR OAK AND PEARL STREETS WERE NOT LARGE ENOUGH AND RECOMMENDED A <br />'DESIGN WHICH'WOULD GIVE A CLEAR ,WATER WAY AREA OF AT LEAST 154 SQUARE FEET. IN ACCORDANCE <br />WITH THIS RECOMMENDATION THE FOLLOWING RECOMMENDATION WAS MADE BY THE GITY MANAGER FOR <br />RECOMMENDED APPROVAL BY THE COMMITTEE. <br /> <br />I <br /> <br />OAK STREET BRIDGE -, CHANGE. FROM 16 FOOT METAL ARCH PLAT AT A LOW BID FIGURE OF <br />$7,656.50 TO A lo-.OOT BY II-rOOT DOUBLE BOX REINFORCED CONCRETE CULVERT AT AN <br />ADDITIONAL COST .OF." $3,839.98, APPORTIONED FROM 51 CUBIC YARD ADDITIONAL CONCRETE <br />AND 19,000 POUNDS.OF STEEL, BRINGING THE TOTAL ESTIMATED COST OF THE OAK ST~EET. <br />BRIDGE TO $11,496.48. <br /> <br />PEARL STREET BRIDGE - THE METAL ARCH CULVERT AT PEARL STREET WOULD BE REPLACED <br />WITH A 10-rOOT BY II-FOOT DOuBLE REIN.ORCED CONCRETE BOX CULVERT AT AN ADDITIONAL <br />COsT OF $5,963.20, APPORTIONED TO COVER ADDITION .CONCRETE REINFORCED STEEL AND <br />EXCAVATION. THIS CULVERT IS NOW DESIGNED TO OPEN UP BOTH PEARL AND 17TH AVENUE <br />WITH AN ADDITIONAL CULVERT LENGTH OF 34-FEET WHICH ACTUALLY GIVES THE SERVICE OF <br />TWO,CULVERTS FOR AN OYER-ALL ESTIMATED COST OF $15,989.00. <br /> <br />THE TOTAL COST OF BOTH BRIDGES, OAK AND PEARL TO INCREASE THEIR CAPACITIES TO COMPLY <br />WITH THE ARMY ENGINEERS NEW DESIGN UNDER THIS PROGRAM WILL BE 89,803.18 WHICH WOULD BRING <br />THE TOTAL ESTIMATED COSTS OF THE FOUR BRIDGES, OAK, PEARL, 19TH AND CHAMBERS TO $4o,055.~8 <br />WHICH INCLUDES THE ADDITIONAL 34-FEET IN LENGTH AT PEARL AND 17TH AND PROVIDES DouBLE <br />CAPACITY TO APPROXIMATELY 200 SQUARE .EET AT OAK AND PEARL. <br /> <br />I. <br />IT IS RECOMMENDED BY THE COMMITTEE THAT THE ABOVE PLAN BE APPROVED AND THAT A CONTRACT <br />BE ENTERED INTO WITH THE CASCADE eONSTRUCTION AND ENGINEERING COMPANY, LOW BIDDER ON THE <br />ABOVE CULVERTS FOR THE ABOVE'CHANGES. <br /> <br />5. UPON FURTHER INVESTIGATION PERTAINING TO THE IMPROVEMENT OF TAYLOR STREET FROM 12TH <br />TO 13TH, IT WASiRECOMMENDED THAT THIS STREET BE IMPROVED AS PREVIOUSLY PETI~IONED AND <br />THAT THE ABUTTING PROPERTY OWNERS BE NOTI.IED. ~N MAKING THIS RECOMMENDATION IT WAS <br />NOTED THAT MR. ,GLENN M. WOODS 'IS .GOING TO CONSTRUCT A DUPLEX, MR. NOIE HERSCHEY, TWO <br />HOMES AND MR. WILLIAM COONS ONE HOME, ALL ABUTTING TAYLOR STREET BETWEEN 12TH AND 13TH <br />AND THAT IT AP~EARS TO BE' IMPtRATIVE THAT THIS-sTREET BE OPENED UP TO AFFORD ACCESS TO <br />THESE RESIDENCES. THIS PROJECT IS READY FOR l'O OPENING IN JUNE. <br /> <br />I <br /> <br />~' <br /> <br />6. WITH REFERENCE TO THE REQUEST TO VACATE THE ALLEY BETWEEN 20TH AND 21ST AND ALDER <br />AND KINCAID .ROM MR. AND M~s. ELSTON 0. 2065 ALDER STREET, THE COMMITTEE RECOMMENDS THAT <br />IT BE DENIED DUE TO THE PRESENT POLICY OF THE CITY COUNCIL IN VACATING NO ALLEYS OR STREETS <br />WHERE ANY POSSIBILITY OF THEIR FuTURE USE MIGHT EXiST. <br /> <br />7. WITH REFERENCE TO THE PETITION SIGNED BY 76.16% OF THE PROPERTY OWNERS ABUTTING <br />EAST 33RD,AvENUE FROM DONALD STREET TO THE AMAZON REQUESTING THE INSTALLATION OFA STORM <br />SEWER WITH THE AGREEMENT THAT THE PROPERTY OWNERS WOULD AGREE TO AN ASSESSMENT OF 50% 0. <br />THE COST UNDER THE BANCROFT lAW WAS STUDIED WITH THE RECOMMENDATION THAT.THIS WORK BE <br />WITHHELD UNTIL ADEQUATE FUNDS ARE ASSURED iN THE CITY'S SEWER FUNDS. <br /> <br />') <br /> <br />" \. <br /> <br />~. <br /> <br />8. THE'CiTy'MANAGER ABVISED THAT AN AGREEMENT HAD BEEN WORKED OUT WITH THE EUGENE WATER <br />AND ELECTRIC BOARD'WHEREIN THE EUGENE WATER & ELECTRIC BOARD WOULD PURCHASE .IRE HYDRANTS <br />AND ACCESSORIES'"AND INSTALL SAID FIRE HYDRANTS AS MAINS. ARE LAID THROUGHOUT THE CITY AND <br />BILL THE CITY UPON A MONTHLY BASIS AS THESE INSTALLATIONS ARE MADE. IT WAS EXPLAINED <br />THAT THIS PROCEDURE WOULD EN~BLE PROPER INSTALLATION'OF THESE FIRE PLUGS AT THE TIME THE <br />MAINS ARE LAID AND A .SAYING WOULD BE INCURRED THROUGH BUYING THEM BY THE CARLOAD. IT WAS <br />RECOMMENDED BY THE COMMITTEE THAT THE ACCOMPANYING RESOLUTION BE ADOPTED BY THE CITY <br />COUNCIL. <br /> <br />I <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.