Laserfiche WebLink
<br />~ <br /> <br />~? -, <br />q) '..J ,1. <br /> <br />e <br /> <br />I <br /> <br />I I <br /> <br />COMMUNICATION FROM THE EUGENE WATER & ELECTRIC BOARD - POWER LOAD WAS SUBMITTED AND READ <br />AS FOLLOW.s: <br /> <br />"THE OPERATING EXPERIENCE OF THE EUGENE WATER & ELECTRIC BOARD SHOWS AN EVER IN- <br />CREASING POWER LOAD IN THE' BUSINESS DISTRICT OF EUGENE. WHICE THIS IS A GOOD HEALTHY <br />CONDITION IT SOMETIMES IS A LITTLE ROUGH ON THE UTILITY INVOLVED., <br /> <br />AT THE PRESENT THE BOARD HAS THREE 2,400 VOLT SUBSTATIONS FEEDING INTO THIS AREA <br />AND STUDIES SHOW THEY WILL HAVE TO BE RELIEVED THIS SUMMER IF WE ARE TO CARRY THE LOAD <br />EXPECTED IN THE WINTER OF 1953-54. ArTER CONSIDERABLE STUDY, THE ENGINEERS OF THE BOARD <br />HAVE DECIDED THE BEST WAY TO HANDLE THIS INCREASED AND CONTINUALLY GROWING LOAD IS TO <br />I NSTALL A 12,000 VOLT NETWORK SYSTEM. THE BOARD HAS BUDGE~ED $90,000.00 FOR THE PORTION <br />SCHEDULED FOR THIS SUMM~R. <br /> <br />e <br /> <br />THE TRANSFORMERS USED IN A NETWORK SYSTEM ARE SO LARGE AS TO MAKE IT IMPRACTICAL <br />TO PLACE THEM IN THE AIR ON PLATFORMS SUCH AS OUR PRESENT SYSTEM USES. .THE ALTERNATIVE <br />IS TO RENT SPACE IN BUILDINGS OR TO PLACE THE TRANSFORMERS IN UNDERGROUND VAULTS EITHER <br />UNDER THE SIDEWALKS OR IN THE ALLEYS. PORTLAND, SEATTLE, SPOKANE AND BOISE ALL PLACE <br />THEIR VAULTS UNDER THE SIDEWALK AND AFTER CONSIDERABLE STUDY, THAT SEEMS MOST DESIRABLE <br />FOR EUGENE. PLACING THE VAULT IN THE ALLEY NOT ONLY REQUIRES A MUCH HEAVIER ROOF TO <br />CARRY TRUCK TRAFFIC AS AGAINST FOOT TRAFFIC ON THE SIDEWALK, BUT INSTALLATION OR MAINTE- <br />NANCE EFFECTIVELY CLOSES THE ALLEY TO ALL TRAFFIC UNTIL COMPLETED. (THERE ARE EXISTING <br />VAULTS UNDER THE SIDEWALK AT THE PENNY AND TELEPHONE BUILDINGS.) <br /> <br />I <br /> <br />THE NETWORK SYSTEM AS NOW PLANNED WOULD START WITH THREE AERIAL CABLES EACH APPROXI- <br />MATELY THREE INCHES IN DIAMETER CARRIED ON THE POLES NEAR THE BUILDINGS AT AN ELEVATION <br />OF ABOUT 30 FEET ABOVE GROUND. THE SYSTEM AS U[TIMATELY PLANNED WOULD REPLACE ALL THE <br />OPEN WIRES IN THE ALLEYS WITH THESE CABLES. AND OF COURSE ALL OF TRANSFORMER PLATF~RMS <br />WOULD BE REMOVED. SUCH A SYSTEM PROVIDES SERVICE TO THE CUSTOMER THAT IS CONSIDERABLY <br />MORE RELIABLE THAN THE PRESENT SYSTEM. <br /> <br />To SUM UP: <br /> <br />I. THE NETWORK SYSTEM WILL ENABLE THE UTILITY TO CARRY ANY FORESEEABLE LOAD <br />FOR MANY YEARS WITHOUT THE NECESSITY OF BUILDING ANOTHER SUBSTATION IN <br />THE DOWNTOWN AREA. <br /> <br />2. THE SYSTEM WILL GREATLY INCREASE THE RELIABILITY OF SERVICE TO THE CUSTOMER. <br /> <br />. <br /> <br />3. <br /> <br />THE SYSTEM WILL CLEAN uP THE ALLEYS; MAKE THEM MORE SIGHTLY, PERMIT THE ALLEY <br />INTERSECTION LIGHTS TO FUNCTION MORE EFFECTIVELY AND PROVIDE ROOM FOR FIRE <br />LADDERS AND APPARATUS. <br /> <br />IF THIS MEETS WITH YOUR APPROVAL WOULD YOU PLEASE SUBMIT A LETTER TO THE EUGENE <br />WATER &. ELECTRIC BOARD STATING THAT YOU HAVE NO OBJECTION TO THE USE OF THE AREA UNDER THE <br />SIDEWALKS (AND UNDER THE CITY PARK AS SHOWN) FOR THE TRANSFORMER VAULTS. <br /> <br />A MAP OF THE SYSTEM AS NOW PLANNED IS ENCLOSED." <br /> <br />I <br /> <br />IT WAS 140VED BY GODLOVE, SECONDED BY CRUMBAKER THAT THE COMMUNICATION BE REFERRED TO THE <br />PUBLIC WORKS COMMITTEE. MOTION CARRIED. <br /> <br />12 <br /> <br />'COMMUNICATION FROM WALTER BANKS, CHAIRMAN OF THE STREET LIGHTING COMMITTEE WAS SUBMITTED <br />AND READ AS FOLLOWS: <br /> <br />"As YOU KNOW, THE STREET LIGHTING COMMITTEE OF THE PLANNING COMMISSION HAS BEEN <br />WORKING ON AN OVER-ALL PLAN FOR IMPROVI NG STREET LIGHTING IN EUGENE. <br /> <br />e <br /> <br />THE COMMITTEE RECOMMENDED, AND THE COUNCIL APPROVED, THE LIGHTING OF THE PACIFIC <br />HIGHWAY THROUGH EUGENE. THIS ROUGHLY IS SIXTH AND SEVENTH AVENUES AND FRANKLIN BLVD. <br />BETWEEN EAST AND WEST CITY LIMI TS. THIS FIRST STEP IN THE OVER-ALL STREET LIGHTING PLAN <br />IS ABOUT THREE-FOURTHS COMPLETED. <br /> <br />AN AREA BETWEEN HIGH AND LINCOLN STREETS ON SIXTH AND SEVENTH AVENUES WILL BE <br />OMITTED PRESENTLY FOR THE REASON THAT IT PROBABLY WILL BE INCLUDED WITH A BUSINESS <br />DISTRICT PROJECT. <br /> <br />THE LIGHTING COMMITTEE HAS NOT TAKEN ANY ACTION AS TO THE NEXT STEP TO BE RECOMMENDED; <br />HOWEVER, THE RETAIL MERCHANTS DIVISION OF THE CHAMBER OF COMMERCE IS ASKING THAT ORNAMEN- <br />TAL STREET LIGHTING IN THE DOWNTOWN BUSINESS AREA BE GIVEN ATTENTION NEXT. <br /> <br />I <br /> <br />ORNAMENTAL LIGHTING IN THE DOWNTOWN AREA WOULD BE CONSIDERABLY MORE EXPENSIVE THAN <br />THE TYPE OF INSTALLATION ALL READY MADE BECAUSE OF THE TYPE OF METAL STANDARDS DESIGNED <br />AND ALSO THE WIRING WOULD OF NECESSITY BE PLACED UNDERGROUND. COST STUDIES ARE BEING <br />MADE AT THE PRESENT TIME BUT BEFORE GOING FURTHER THE STREET LIGHTING COMMITTEE DESIRES <br />AN EXPRESSION, FROM THE COUNCIL AS TO SOME ACCEPTABLE MEANS OF FINANCING THE PROJECT IF <br />IT DEVELOPS. <br /> <br />THANK YOU VERY MUCH FpR YOUR CONSIDERATION OF THIS POINT AND WE AWAIT YOUR REPLY." <br /> <br />IT WAS MOVED BY KOPPE, SECONDED BY CRUMBAKER THAT THE COMMUNICATION BE REFERRED TO THE <br />PUBLIC WORKS AND FINANCE COMMITTEES. MOTION CARRIED. <br /> <br />. <br /> <br />13 <br /> <br />COMMUNICATION FROM H. F. McDANIEL - RE: TRAILER HOUSES WAS SUBMITTED AND READ AS FOLLOWS: <br /> <br />~ <br />