My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvements Program <br /> <br />Waste Activated Sludge Thickening (Gravity Belt Thickener Building/Equipment <br />Expansion) <br />FY 05-06 Capital Budget = $2,657,000 <br /> <br />Expected cash flow: * FY 05-06 $664,000; FY 06-07 $1,993,000. <br /> <br />The 2004 MWMC Facilities Plan includes a third gravity belt thickener, which requires expanding <br />the existing building. This provides additional capacity for waste activated sludge thickening and <br />should help delay construction of an additional digester. <br /> <br />Design work is proposed for 2005 and construction is planned for 2006 to 2007. <br /> <br />Biocycle Farm Phase 2 Improvements <br />FY 05-06 Capital Budget = $319,000 <br /> <br />Expected cash flow: * FY 05-06 $319,000. <br /> <br /> Phase 2 of Biocycle Farm involves soil preparation and planting of an additional 130 acres to <br /> increase biosolids removal biosolids from the existing lagoons. Consistent with the MWMC <br /> Biosolids Management Plan, this Biocycle Farm expansion provides MWMC with more flexibility <br /> and control of the overall biosolids management program. It also will enable MWMC to meet the <br /> revised DEQ-approved time line for draining and relining the facultative sludge lagoons. <br /> <br /> The soil preparation and planting work is planned for 2005 and 2006. <br /> <br /> Biocycle Farm Hose Reels <br /> FY 05-06 Capital Budget = $420,000 <br /> <br /> Expected cash flow: * FY 05-06 $420,000. <br /> Additional hose reels need to be purchased to increase liquid biosolids application to the MWMC <br /> Biocycle Farm. Anticipated pumping capacity reductions resulting from pump station <br /> modifications require the addition of six new hose reels rather than the four originally proposed. <br /> Federal grant funding, which is pending final approval, is anticipated to offset a significant portion <br /> of the hose reel costs. <br /> <br /> The hose reel equipment purchase is planned for 2005 to 2006. <br /> <br /> Biosolids Management Facility (BMF) - Lagoon Lining Phase 1 & Dredge Movement System <br /> Improvements <br /> FY 05-06 Capital Budget = $1,858,000 <br /> <br /> Expected cashflow: * FY05-06 $619,000; FY 06-07 $1,239,000. <br /> <br /> On-site field testing indicates that the BMF has lagoons that may be leaking. The lagoons have <br /> served their 20-year design life, and gradual deterioration is to be expected. MWMC has <br /> committed to DEQ to reline the four lagoons, which will require removal of the existing biosolids <br /> material. This project will include upgrades to the existing dredge movement system for safety <br /> and operational efficiency. <br /> <br /> Review Draft April 21, 2005 Page 32 FY 05-06 BUDGET AND CII~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.