My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Managemen! Commission Capital Improvements Program <br /> <br />project needs to be coordinated with other pump station improvements that have a direct <br />connection to the WPCF (example - Willakenzie Pump Station Expansion). <br /> <br />Design work is proposed for 2005-06 and construction is scheduled for 2006 to 2008. <br /> <br />Willakenzie Pump Station Expansion (related to Influent Pumping Solution) <br />FY 05-06 Capital Budget = $6,377,000 <br /> <br />Expected cash flow: * FY 05-06 $2,000,000; FY 06-07 $2,377,000; FY 07-08 $2,000,000. <br /> <br />The Willakenzie pump station project must be coordinated with the influent pumping project and <br />should be under the same consultant contract. DEQ pumping redundancy requirements will need <br />to be reviewed by the design consultant/team and MWMC as the project develops. The 2004 <br />MWMC Facilities Plan recommends adding Willakenzie pump improvements to increase the <br />capacity from 80 to 135 mgd. <br /> <br />Design work is proposed for 2005-06 and construction is scheduled for 2006 to 2008. <br /> <br />Additional Odorous Air Treatment <br />FY 05-06 Capital Budget = $2,445,000 <br /> <br />Expected cash flow: * FY 05-06 $611,000; FY 06-07 $1,834,000. <br /> <br />Odor control systems (biofilters, biotowers, etc.) will need to be increased to maintain MWMC <br />neighborhood compatibility and help address odor complaints. Some targeted odor sources will <br />include the primary clarifiers, gravity thickeners, and pretreatment expansion. The design work <br />will need to be coordinated with projects identified in the conceptual design and related technical <br />memos. <br /> <br /> Design work is proposed for 2006 and construction is phased from 2007 to 2012 as new treatment <br /> processes are upgraded or expanded. <br /> <br /> 9th & 10th Secondary Clarifiers Design <br /> FY 05-06 Capital Budget = $1,004,000 <br /> <br /> Expected cash flow: * FY 05-06 $1,004,000. <br /> The 2004 MWMC Facilities Plan includes construction two new secondary clarifiers (9th and l0th) <br /> to provide additional secondary treatment and peak flow management, which is consistent with the <br /> WWFMP (2001). The wet weather secondary capacity will increase from approximately 100 to <br /> 160 mgd. In order to complete this project, additional funds of approximately $5.9 million will be <br /> requested in a future budget. This project will need to coordinate with the secondary clarifier <br /> enhancement project to maintain similar equipment/components. <br /> <br /> Design work is proposed for 2005 and construction is planned for 2006 to 2008. <br /> <br /> Review Draft April 21, 2005 Page 31 FY 05-06 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.