My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: MWMC Budget and CIP
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 05/09/05 WS
>
Item B: MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:14:18 PM
Creation date
5/4/2005 3:15:10 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Budget Message <br /> <br /> BUDGET MESSAGE <br /> <br />METROPOLITAN WASTEWATER MANAGEMENT COMMISSION MEMBERS: <br /> <br />Introduction <br /> <br />Consistent with the Intergovernmental Agreement, I am presenting a proposed budget for FY 05- <br />06 that funds operations, administration, and capital projects planned for the Regional <br />Wastewater Program (RWP). The Metropolitan Wastewater Management Commission <br />(MWMC) administration and Capital Improvements Program (CIP) components of the budget <br />are reflected in the regionally funded portions of the City of Springfield's Environmental <br />Services Division, Public Works Administration and Finance Department budgets. The <br />operatiOns, maintenance, equipment replacement, and major rehabilitation components are <br />reflected in the regionally funded portions of the City of Eugene's Wastewater, Engineering and <br />Maintenance Divisions' budgets. The Cities' Industrial Pretreatment Programs, managed locally <br />in compliance with the MWMC Model Ordinance, also are included in the RWP budget. <br /> <br /> The C~ portion of the budget for FY 05-06 includes funding for several ongoing capital projects <br /> that implement the Commission's Biosolids Man/tgement Plan (1997), Wet Weather Flow <br /> Management Plan (2001), and Facilities Plan (2004). Projects carried over from FY 04-05 <br /> include: completion of phase one of Biocycle Farm; modifications to the lab expansion to <br /> improve acid neutralization capability; improvements to the digester mixing, primary <br /> clarification, secondary 'clarification, and south aeration basin facilities; and installation of <br /> construction management facilities. Unexpended funds for these projects, which were budgeted <br /> in FY 04-05, are being carried forward into FY 05-06 to support actual project schedules. New <br /> capital projects in the FY 05-06 CIP and budget include additional improvements to the Regional <br /> Wastewater Facilities, all of which implement the MWMC Facilities Plan, as adopted by the <br /> Commission and the Eugene, Springfield, and Lane County Governing Bodies in 2004. The FY <br /> 05-06 CIP projects are scheduled and budgeted in accordance with a phasing plan needed to <br /> maintain compliance with the MWMC effluent discharge permit and to provide capacity on an <br /> as-needed basis. The new FY 05-06 projects will primarily address the need for expanded peak <br /> wet weather flow management capability (i.e. influent pumping and design for two new <br /> secondary clarifiers), odor control, waste activated sludge thickening, continued implementation <br /> of biosolids production enhancements to reduce capacity constraints in the facultative sludge <br /> lagoons, as well as the adopted WWFMP strategies. Other Capital Programs, including Major <br /> Rehabilitation, Equipment Replacement, and Major Capital Outlay also are funded in the <br /> proposed FY 05-06 CIP and budget. <br /> <br /> The proposed FY 05-06 RWP Operating Budget includes a 0.3 FTE increase in the City of <br /> Springfield staffing, which reflects the net effect of a minor reallocation of personnel resources <br /> between local and regional (MWMC) programs and recognizes minor organizational changes <br /> implemented in FY 04-05. City of Eugene staffing will increase by 2.14 FTE to account for <br /> reallocation of staff in regional versus local programs and the addition of one FTE to assist with <br /> the increased workload at the Biosolids Management Facility/Biocycle Farm. Except for staffing <br /> levels and non-discretionary personnel costs, RWP managers prepared budgets that absorb <br /> unavoidable cost increases where possible. Most of the proposed budget increases associated <br /> <br /> Review Draft April 21, 2005 Page 1 FY 05-06 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.