Laserfiche WebLink
<br />r ff"'\ G'~ ,-~ <br />r J~b <br /> <br />e <br /> <br />(2) THE NAUTRAL RESIDENTIAL AND CULTURAL GROWTH OF THE CITY OF EUGENE HAS SURROUNDED <br />THE AIRPARK ON THREE SIDES TO A DEGREE WHICH MAKES THE AIRPARK INCOMPATIBLE WITH <br />SURROUNDING LAND USE AND UNSUITABLE FOR REGULAR TWIN ENGINE AIRCRAFT OPERATION <br />IN THE ABSENCE OF SUBSTANTIAL CAPITAL INVESTMENT FOR RUNWAY EXTENSION, lAND AC- <br />QUISITION AND RELOCATION OF 18TH STREET. <br /> <br />I <br /> <br />(3) AN EXHAUSTIVE STUDY OF LOCAL AND VISITING AIRCRAFT OWNER CONDITIONS, VOLUME AND <br />TYPE, INDICATE THAT MAHLON-SWEET'AIRPORT CAN SERVE THE AIR TRADE OF THE EUGENE- <br />SPRINGFIELD AREA WITH REASONABLE CONVENIENCE. <br /> <br />(4) THE ANNUAL COST OF THE AIRPARK TO THE CITY OF EUGENE IS EXCESSIVE WHEN THE VALUE <br />OF THE LAND AND THE REQUIREMENT FOR OPERATION OF TWO MUNICIPAL AIRPORTS IS CON- <br />SIDERED. <br /> <br />PART I I OF THE REP6RT TITLED "DEVELOPMENT OF MAHLON SWEET AIRPORT" AND FILED WITH <br />THE CITY ON DECEMBER 20, 1954 WAS ALSO SUMMARIZED BY MR. FISHER. THIS PART, ITWAS <br />EXPLAINED, CONTA,INS THE MASTER PLANNING AND FINANCI~L INFORMATION APPLICABLE TO THE <br />PROPOSED RE-DEVELOPMENT OF MAHLON SWEET AIRPORT. IT WAS POINTED OUT BY MR. FISHER <br />THAT THIS PART OF THE REPORT IS PREDICATED UPON THE CLOSING OF EUGENE AIRPARK AND <br />CENTRALIZING ALL OF EUGENE'S AVIATION ACTIVITY ON MAHLON SWEET AIRPORT USING THE FUNDS <br />FROM THE SALE OF THE AIRPARK SITE TO PROVIDE FACILITIES TO SERVE ,GENER'AL AVIATION, EXE- <br />CUTIVE, CORPORATE AND'CIVIL TRANSIENT AIRCRAFT BUSINESS ON Mfl,HLON SWEET AIRPOO. 'IT'WAS <br />EXPLAINED ALSO THAT THE REPORT SETS FORTH THE OPERAT10NS POLICY AND' THE RATES AND CHARGES, <br />LEASES AND CONTRACTS, PERSONNEL AND OTHER RELATED SUBJECTS WHICH ARE RECOMMEND8D FOR USE <br />IN DEVELOPING, OPERATING AND MAINTAINING THE RE'VISED AIRPORT.' <br /> <br />e <br /> <br />MUCH OF THE MEETING WAS DEVOTED TO QUESTIONING MR. FISHER REGARDING HIS FINDINGS <br />AND CONCLUSIONS, AND IN DISCUSSING THE FEA~IBILjTY OF A SECOND CLOSE-IN AIRPORT. <br /> <br />I <br /> <br />As A RESULT OJ=' THE COMM'ITTEE'S STUDY AND DELIBERATION ON THE'REPORT'A'ND ON RECENT <br />DEVELOPMENTS AFFECTING EUGENE'S AIRPORT PROBDEMS IT IS THE RECOMMENDATION OF THE <br />COMMITTEE THAT THE C~UNCIL ACCEPT THE REPORT OF LEIGH FISHER AND ASSOCIATES ON "AVIATION <br />AND AI RPORTS 'OF EUGENE, OREGON,"' AND THAT THE COUNC I L ADOPT THE FOLLOWI NG POLl CY WI TH <br />RESPECT TO AIRPORT REDEVELOPMENT: <br /> <br />I. <br /> <br />THAT~HE EUGENE AIRPARK BE CLOSED TO AIRCRAFT ACTIVITIES AS SOON AS POSSJBLE BUT <br />NOT UNTIL ADEQUATE FACILITIES ARE PROVIDED FOR SUCH ACTIVITIES AT'MAHLON SWEET <br />AIRPORT. <br /> <br />. <br /> <br />2. THAT THE PLAN OF THE CITY OF EUGENE WILL BE THE DEVELOPM~NT ~F ONLYONEAIR~ORT <br />(MAHLON SWEET FIELD) AND TO DEVELOP IT AS A FIRST CLASS, 24 HOUR A DAY ALL W~ATHER <br />AIRPORT, CAPABLE O~ A HIGH STANDARD OF SERVICE ~OR ALL TYPES OF AVIAT10N'ACTIVITY. <br /> <br />3. THAT THE OLD'AIRPARK LAND ~ND SURPLUS AIRPORT LAND ~E SOLD OR OTHERWISE DISPOSED <br />'OF,' BUT THAT THE FA'IR MARKET V,ALUE OF ALL SUCH L'AND BE EA'RMARKED FOR FINANCING THE <br />MAHLON SWEET FIELD DEVELOPMENT PROGRAM. IN ADDITION THAT THE C1TY APPLY FOR FULL <br />COOPERATION OF THE FEDERAL GOVERNMENT UNDER THE FEDERAL AIRPORT AID PROGRAM. <br /> <br />4. <br /> <br />,THAT THE PLA'N, FOR OPERATION OF THE IMPROVED MAHLON SWEET AI RPORT I NCLUDE' A CON- <br />TRACTUAL ARRANGEMENT WI TH AN AVI ATI'ON COMMERCI AL SERVI CE 'OPERATOR (FI X,ED BASE' <br />OPERATOR) OF PROVEN MANAGEMENT ABILITY TO PRO~IPE A FUL~ AND COMPLETE HIGH TYPE <br />AVIATION SERVICE TO ALL INTERESTS IN THE UPPER WILLAMETTE VALLEY. <br /> <br />I <br /> <br />5. 'THAT'T~ SAFEGUARD THE OPERATION AND INVESTMENT AT MAHLON'SWEET AIRPORT AND IN THE <br />INTEREST OF PUBLIC SAFETY THAT THE CITY SECURE AVIGATION EASEMENTS COVERING AIR <br />RIGHTS AROUND THE AIRPORT AREA IN ADDITION TO ZONING LAND IN THE VICINITY OF <br />MAHLON SWEET FIELDFo"R LAND'USE. <br /> <br />e <br /> <br />THE COMMITTEE ALSO RECOMMENDS 1r0RAAPPROVAL THE FOLLOWING LINE OF ACTION TOWARD'THE <br />AIRPORT DEVELOPMENT PROGRAM. <br /> <br />A. SECURE APPRAISALS OF FAIR VALUE OF AIRPARK LAND AND SURPLUS LAND AT MAHLON <br />SWEET 'AIRPORT. - ALSO SECURE APPRAI SALS OF LAND FOR N~S RUNWAY EXTENSION AND <br />: DOOLITTLE EXTENSIONS. <br /> <br />B. SUBM1T REVISED MASTER PLAN FOR MAHLON SWEET AIRPORT TO CAA AND'STATE BOARD <br />or AERONAUTICS FOR APPROVAL~ <br /> <br />C. PREPARE ENGINEERING TOPOGRAPHICAL MAP OF MAIN BUILDING AREA A~ AN ~XTENS10N <br />OF CHART 9 PAGE 32 (PART II or REPORT). <br /> <br />D. SECURE DESIGN AND CdST ESTIMATES OF T HANGAR UNITS. <br /> <br />E. <br /> <br />GET ESTIMATES or COST'Of COMPLETIVN OF AIRPORT ADMINISTRATIVE BUILDING. <br /> <br />I <br /> <br />e <br /> <br />~ <br />