Laserfiche WebLink
<br /> 53~; <br /> e <br /> ---- - -- -- ---- ------ - - ---.-- <br /> j I <br /> REPORTS OF COMMITTEES : <br /> A REPORT OF THE COMMITTEE MEETING HELD ON JULY 26, "1957 - RE: PUBLIC WORKS COMMITTEE - RE- <br /> QUEST FOR VACATION OF'CHARNELTON STREET FROM 26TH TO 27TH AVENUE; DISCUSSION REGARDING THE DE- <br /> TERMINATION OF THE WIDTH OF 25TH AVENUE FROM HILYARD STREET TO ALDER STREET; DISCUSSION REGARD- <br /> ING POLICY ON THE WIDTH Of THE PAVING FOR HILYARD STREET FROM 24TH AVENUE SOUTH; REQUEST BY R. L. <br /> FOLLETT FOR PERMISSION TO PLACE FOOTINGS ON PUBLIC PROPERTY; PUBLIC SAFETY COMMITTEE - DISCUSSION <br /> REGARDING PROPOSED STOP SIGN AT 23RD AVENUE AND LINCOLN STREET; COMMITTEE OF THE WHOLE - DIscus- <br /> SION REGARDING PURCHASE OF BASE RADIO STATION FOR THE FIRE DEPARTMENT; DISCUSSION REGARDING ZON- <br /> ING ~TUDY ON WILLAM~TTE,STREET; DISCUSSION REGARDING PAVING Of WILLAMETTE STREET FROM 32ND AVENUE <br /> TO SOUTH CITY LIMITS; DISCUSSION REGARDING BUDGET COMMITTEE RECOMMENDATION THAT MONEY AVAILABLE <br /> FOR STREET IMPROVEMENTS BE USED ON ARTERIAL STREETS; DISCUSSION REGARDING BUDGET COMMITTEE RE- <br /> COMMENDATION CONCERNING SEWER CONSTRUCTION TO SERVE THE WEST 11TH AVENUE AREA; DISCUSSION ON WAYS <br /> AND MEANS Of RAISING MONEY FOR A NEW CITY HALL; DISCUSSION REGARDING POSSIBILITY Of USING PRESENT <br /> LIBRARY BUILDING fO~ EXPANSION Of CITY OffiCES WHEN THE NEW LIBRARY BUILDING IS COMPLETED; WAS <br /> SUBMITTED AND'READ AS FOLLOWS: <br /> "PRESENT: COUNClLMEN,WATSON, HARTMAN, SHISLER, EDMUNDS, LAURIS AND LINDEEN; CITY MANA~ I e <br /> I <br /> GER; ~ITY ,RECORDER; CITY ATTORNEY; DIRECTOR OF PUBLIC WORKS; ADMINISTRATIVE I <br /> ASSISTANT; TRAFfiC ENGINEER; DAN WYANT, EUGENE REGISTER-GUARD. <br /> I <br /> 6 PUBLIC WORKS CQMMITTEE , <br /> I <br /> I. REQUEST FOR VACATION OF CHARNELTON STREET fROM 26TH TO 27TH AVENUE - A PETITION <br /> CONTAINING 100.0% Of THE OWNERSHIP O~ THE p'ROPERTY LOCATED ON CHARNELTON STREET I <br /> BETWEEN 26T~ AND 27TH AVENUES WAS PRESENTED TO THE, COMMITTEE. , THE COMMITTEE <br /> VISITED THE AREA TO OBTAIN A FIRST HAND IMPRESSION OF THE PROPOSED VACATION. IT <br /> WAS NOTED THAT IF CHARNELTON STREET WERE CONTINUED AT ITS PRESENT LOCATION, PRO- <br /> PERTY HOLDERS NOW FRONTING OLIVE STREET WOULD ALSO FRONT ON CHARNELTON STREET, <br /> AND THE COST OF STREET PAVING WOULD NECESSARILY BE BORNE BY,THE SAME PROPERTY <br /> . HOLDERS WHEN OLIVE AND CHARNELTON STREETS ARE PAVED. IT'WAS ALSO NOTED THAT <br /> CHARNEL TON STREET DEAD ENDS ONE HALF BLOCK SOUTH OF 27TH AVENUE AT THE FRANCES <br /> WILLARD SCHOOL GROUNDS. AfTER SOME DISCUSSION AND EXCHANGE OF THE COM- I <br /> I DE AS, <br /> MITTEE RECOMMENDED THAT THE REQUEST FOR VACATION BE GRANTED SUBJECT TO ANY DIRT <br /> WHICH MAY BE.MOVED FROM THE LOCATION OF CHARNELTON STREET BEING PLACED AT THE <br /> LOCATION OF 27TH AVENUE BETWEEN CHARNELTON AND LINCOLN STREETS IN A RAVINE RUN- <br /> NING.THROUGH THE, AREA. 1- <br /> . <br /> 2. DISCUSSION REGARDING THE DETERMINATION OF THE WIDTH Of 25TH AVENUE FROM HILYARD <br /> STREET TO ALDER STREET - IT WAS EXPLAlNED THAT THERE WAS A DISCREPANCY IN THE <br /> PLATTING AND PROPERTY OWNERSHIPS I N THE AREA 'WEST OF ALDER STREET AND NORTH Of I <br /> 25TH AVENUE AS IT NOW EXISTS IN THE CITY Of EUGENE AND THAT DUE TO THE DISCREPANCY , <br /> I <br /> THERE IS INSUfFICIENT PROPERTY fOR A STREET TO BE PAVED AND ALLOW FOR SIDEWALKS. 1 <br /> IT WAS fURTHER INDICATED THAT THE PROPERTY 'HOLDER AT THE NORTHWEST CORNER Of 25TH <br /> AVENUE AND ALDER STREET IS WILLING TO DEED"SUFFICIENT PROPERTY TO THE CITY fOR <br /> THE NECESSARY RIGHT-OF-WAY, PROVIDING CURB SIDEwALKS ARE ALLOWED IN THE AREA. <br /> REPRESENTATIVES Of THE COMMITTEE DISCUSSED THIS SITUATION WITH THE DIRECTOR,Of <br /> PU~LIC WORKS~ AND IT WAS fELT THAT BY THE RECEIPT Of SUCH A DEED SUffiCIENT <br /> PROPERTY WOULD BE AVAILABLE FO~ THE STREET AND .SIDEWA~K TO BE PROPERLY LOCATED I <br /> AND TH~T THIS WOULD BE THE MOST LOCICAL CONCLUSION TO THE PROBlEM. THE COMMI TTEE <br /> RECOMMENDED THAT THE.CllY .OF EUGENE ACCEPT A DEED FROM.THEPROPERTY HOLDER fOR <br /> APPROXIMATELY 8 FEET OF PROPERTY AND THAT CURB SIDEWALKS BE ALLOWED I N THE AREA. <br /> I <br /> 3. D"SCUSSION REGARDING POLICY ON THE WIDTH OF THE PAVING FOR HILYARD STREET ,fROM <br /> 24TH AVENUE SOUTH - IT WAS EXPLAINED THAT THE STANDARD OIL COMP,ANY HAD REQUESTED , <br /> , <br /> , <br /> THAT A DETERMINATION BE MADE AS TO THE WI.DTH OF HILYARD.STREET AT 25TH AVENUE i <br /> I <br /> WHICH REQUIRES THAT A DETERMINAtiON BE MADE ON THE PAVING Of HILYARD STREET fROM <br /> 24TH AVENUE SOUTH. IN THE DISCUSSION BY THE COMMITTEE IT WAS INDICATED THAT HIL- e <br /> YARD STREET IS EXPECTED TO BECOME A MAJOR ARTERIAL AND THAT IT SHOULD BE OF ADEQUATE <br /> WIDTH TO CARRY ARTERIAL TRAFFIC. WITH THIS IN MIND, THE COMMITTEE RECOMMENDED THAT , <br /> I <br /> THE fUTURE PAVING Of HILYARD STREET BE TO A WIDTH OF 49 FEET. <br /> . <br /> 4. REQUEST BY R. L. FOLLETT fOR PERMISSION TO PLACE FOOTINGS ON PUBLIC PROPERTY - IT' <br /> WAS INDICATED THAT A REQUEST HAD BEEN RECEIVED fROM MR. 'R. L.foLLETT TO PLACE <br /> FOOTINGS ON PUBLIC PROPERTY ON OLIVE STREET BETWEEN 5TH AND 6TH AVENUES AND ON, <br /> THE ALLEY BETWEEN WILLAMETTE AND OLIVE STREETS BETWEEN 5TH AND 6TH AVENUES. A <br /> PLAN Of THE BUILDI NG AND THE REQUI RED fOOTl NGS WAS SHOWN TO THE COMMI T1EE, THE <br /> PLAN INDICATING THAT THE rOOTINGS WOULD ~XTEND.18" INTO THE RIGHT-Of-WAY rOR I <br /> OLIVE STREET AND 13" INTO THE ALLEY BETWEEN WILLAMETTE AND OLIVE STREETS. THE , <br /> COMMITTEE DISCUSSED THE ITEM, INDICATED THEY HAD NO OBJECTIONS, AND RECOMMENDED <br /> THAT A PERMANENT EASEMENT BE ISSUED FOR 'SUCH FOOTING,CONS~RUCTION. I <br /> , <br /> . ",j'___J . <br /> 7 PUBLIC SAFETY COMMITTEE ",,' I <br /> I. DISCUSSION REGARDING PROPOSED STOP SIGN AT 23RD AVENUE AND LINCOLN STREET - IT I <br /> . I <br /> WAS INDICATED THAT THE CITY MANAGER HAD ASKED THE TRAFFIC ENGINEER TO PREPARE .A , <br /> t <br /> STUDY ONTRAfFIC'AT 23RD AVENUE AND LINCOLN STREET ;WITH THE THOUGHT IN MIND THAT <br /> STOP SI~NS MIGHT BE WARRANTED STOPPING TRAF~IC ON LINCOLN STREET. THE TRAffiC <br /> ENGINEER INDICATED HE HAD STUDIED THE I NTERSECT ION, HAD CHECKED THE ACCIDENT RE- i <br /> i <br /> CORD, AND IN LIGHT OF HIS STUDY AND THE ACCIDENT RECORD DID NOT RECOMMEND STOP I <br /> SIGN INSTALLATION AT THIS I NTERSECTI ON. IT WAS POINTED OUT THAT A FURTHER STUDY I <br /> I <br /> SHOULD BE MADE WHEN LINCOLN STREET IS CONTINUED TO 29TH AVENUE TO SEE If THERE IS <br /> ANY CHANGE IN THE TRAfFIC PATTER~. THE COMMITTEE RECOMMENDED THE ADOPTION OF THE- , <br /> i e <br /> ~ <br />