My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/10/1959 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1959
>
08/10/1959 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2007 12:54:32 AM
Creation date
11/2/2006 3:36:01 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
8/10/1959
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~150 <br />e <br />_ ,_ ~/'0/~9... ___------- ___ ___ _. ~ __ <br /> <br />-----~--~---- --- ------------~------ -~----~ ----- <br />- - - '. -" . . -- ., -.. .. .. f -. <br /> <br /> <br /> <br /> <br /> <br />AFTER READVERT'S'NGTRIS PROJECT TRIO CONSTRUCTION COMPANY NOW 8,DS $6,854.50, III <br />CONSIOERABLY LESS THAN BID EARLIER BY TWO OTHER CONSTRUCTION FIRMS. THE D,- . <br />RECTOR OF PUBLIC WORKS RECOMMENDED THAT THE BID BE AWARDED TO TRIO CONSTRUCTION <br />COMPANY AND THE COMMITTEE UNANIMOUSLY CONCURRED IN THIS RECOMMENDATION. . <br /> <br />B. SANITARY SEWER EAST OF EMERALD STREET FROM 26TH TO 28TH AVENUE - THE DIRECTOR <br />OF PUBLIC WORKS POINTED OUT THAT NO CONSTRUCTION FIRMS HAD BID ON THIS PROJECT <br />BECAUSE OF THE LiMI'TATIONS OF THE EASEMENTS. CONSTRUCTION CREWS WOULD HAVE <br />DIFFICULTY IN CONTAININci THE PROJECT WITHIN THE E~SSMENTS, AND CONTRACTORS DO <br />NOT W~NT TO ASSUME THE RESPONSIBILITY. THE DIRECTOR OF PUBLIC WORKS ALSO <br />POINT~D OUT THAT HIS DEPARTMENT IS UNABLE TO DO THE WORK BECAUSE OF LACK OF <br />PROPER EQUIPMENT. THE COMMITTE'E UNANIMOUS'lY RECOM'MENDED THAT THIS PROJECT , <br />BE READV~RTISED WITH THE STIPULATION THAT PRIVATE CONTRACTORS UNDERTAKE THE <br />PROJECT WITH THE EUGENE PUBL I C WORKS DEPARTMENT ASSUM I NG. THE RESPONS I B I L I TY II <br />FOR DAMAGES TO PRIVATE PROPERTY OUTSIDE THE EASEMENTS GRANTED AS A RESULT OF I <br />CONSTRUCTION. e <br /> <br />C. ALLEY BETWEEN 6TH AI'~D 7TH AVENUES FROM ALMADEN TO f I LLMORE STREET - A REQUES,T <br />FROM ROYAL BIGHAM REGARDING DELAYING PAVING OF THE ABOVE DESCRIBED ALLEY WAS <br />READ TO 'THE COMMITTEE. ALTHOUGH HE WAS A PRINCIPAL PETITioNER, HE NOW EN- i <br />COUNTERS A LARGE AND UNWISE EXPENDITURE TO BURY STEAM PIPES UNDER THE ALLEY I <br />BEFORE CONSWRUCTION CAN BE STARTED. THE COMMITTEE UNANIMOUSLY RECOMMENDED <br />.. . . <br />THAT THE CONTRACT N~T BE- AWARDED AND"THAT THE PROJECT' BE CONS I DERED. AT THE I <br />END Of,NINE MONTHS~ FURTHER, THE ~OMMITTEE RECOMMENDED THAT MR. 'BIGHAM BE , <br />NOTIFIED,THAT THE PROJECT WILL BE COMPLETED DURING'THE SUMMER Of 1960: I <br /> <br />D. PAVING CRESTA DE RUTA FROM NORTH BOUNDARY OF CAP, ITOL HILL ADDITIO~ TO SOUTH . ~I' <br />OF LOT 2, BLOCK 4, AND LOT 2, BLOCK 3, NORTH BOUNDARY - THE DIRECTOR Of PUBLIC <br />WORKS PO I NTED OUT THAT THE COST PER FRONT FOOT OF PAV I NG CRESTA DE RUTA WOULD 1 <br />BE $7.89. HE'fELT PROPERTY OWNERS SHOULD BE NOTIFIED AND AN INDICATION OF THEIR <br />FEELING GAINiD BECAUSE OF THE EXTREMELY Hi~H.COST PER FRONT FOOT. HE ,DID REALIZE ! <br />THAT THE TERRAIN FEATURES WERE THE CAUSE OF THE HIGH COST. THE COMMITTEE RECOM- I <br />MENDED CONTRACTS BE AWARDED TO THE LOW BIDDER ON EACH REMAINING PROJECT INCLUD- <br />ING THE CRESTA DE RUTA PAVINGj HOWEVER, THE MAJORITY OF PROPERTY OWNERS MUST <br />GIVE THEIR APPROVAL OF THE COST PER FRONT FOOT OF THE CRESTA DE RUTA PAVING. <br /> <br />IT WAS MOVED BY MR. SHEARER SECONDED BY MR. CHATT THAT ITEM 6 OF THE COMMITTEE.'REPORT BE <br />APPROVED. MOTION CAR~IED. (CONTRACTS AWARDE~ UNDER BiD OPENING EARLIER iN THE MEETING.) <br /> <br />I 7. REQUEST .FOR'SE~E~ ON EAiT 27TH AVENUE jEtWEEN AGATE AND COLUMBIA STREETS ~ A LETTER <br />WAS READ FROM DR. R. M. OVERSTREET REQUESTING BOTH SEWERS AND PAVING BE iNSTALLED ON I <br />2?T.H AVENUE EAST BETWEEN AGATE AND COLUMBIA STREETS.. THE,COUNCIL EARLIER HAD APPROVED ,'II <br />THE SEWER TO SERVICE THE NORTH SIDE OF THIS STREET. THIS LETTER PROPOSES THE ADDI.- <br />. . I <br />TION OF A SEWER TO BE CONSTRUCTED,ON 27TH AVENUE TO SERVE THE SOUT~ SIDE ONLY. IT ~ <br />IS THE RECOMMENDATION OF THE PUBLIC WORKS DEPARTMENT THAT THE TWO JOBS BE COMBINED 'I <br />AND THAT ORDINANCES BE PASSED AUTHORIZING COMPLETION OF SAID SYSTEM. THE DIRECTOR I <br />OF PUBL I C WORKS I NO! CATED THAT HIS DEPARTMEN~ HAS RECE I ~ED A REQUEST TO RELOCATE . 1,1 I <br />27TH AVENUE AS IT NOW APPEARS IN THE PLATj HGlEVER, IT WAS HIS RECOMMENDATtON'THATj <br />NO ACTION BE TAKEN ON THE GRAOING AND GRAVELING AND INSTALLATION OF SIDEWALKS OR 'It <br />PAVING ON 27TH AVENUE UNTIL SUCH TIME AS IT IS DETERMINED WHETHER OR NOT THE <br />RIGHT-OF-WAY LOCAHON WILL BE REVISED. THE COMMITTEE UNANimuSlY RECOMMENDED THAT , <br />, . <br />THE AREA BE. PROPERLY SERVICED WITH SEWERS AND PROPERTY OWNERS ASSESSED FOR THE, <br />CONSTRUCTION OF THE PROJECT AND THAT .THE NECESSARY ORDINANCE INITIATIN G THE PROJECT i <br />BE PASSED. No ACTION WAS TAKEN ON THE GRADING AND GRAVELING AND INSTALLATION OF i <br />SIDEWALKS OR PAVING ON 27TH AVENUE BETWEEN A?ATE AND COLUMBiA STREETS. 1 ~ <br />,., . . I ., <br />IT WAS MOVED BY MR. SHEARER SECONDED BY MR. CHATT THAT ITEM 7 OF THE COMMITTEE REPORT BE I <br />APPROVED. MOTION CARRIED. i <br />. . - II <br />2 8. REQUEST BY CIVIL AIR PATROL FOR PERMISSION TO HOLD AIR CIRCUS AT MAHLON-SWEET I <br />AIRPORT - THE CITY RECORDER READ A REQUEST fROM THE CIVIL AIR PATROL OUTLIN~~G II. <br />THE PROGRAM FOR AN AIR SHOW AT MAHLON-SWEET AIRPORT TO BE HELD SEPTEMBER 12, 1959. <br />I THE COMM ITTE~ RECOMMENDED THAT THECOUNC', L GRAN: APPROVAL 'FOR PERM I 5S I ON TO USE I. <br />MAHLON-SWEET A I RPORT FOR THE A I R SHOW AND AUTHORI ZE THE CITY MANAGER TO WORKOUT - <br />. . <br />NECESSARY DETAILS. <br /> <br />IT WAS MOVED BY MR'.SHEARER SECONDED BY MR. CHATT THAT ITEM-S OF THE'COMMITTEE REPORT BE I <br />APPROVED. MOTION CARRIED. j <br /> <br />3 9. CONSIDERATION OF BIDS RECEIVED FOR RE-ROOFING JAIL BGILDING - TABULATIONS OF B)DS ~ <br />FOR THE NEW ROOF ON THE MUN I C I PAL JA I L BUI LD I NG WERE PRESENTED TO THE COMM I TTEE. Ii I <br />I THE COMMITTEE UNANIMOUSLY RECOMMENDED THAT' THE CONTRACT BE AWARDED TO JACOBS ROOF- II <br />j ING COMPANY FOR THE BRAND NAME PABCO MATERIAL AT THE BID PRICE OF $1,075.00. II' <br /> <br />.. .. Ij <br />IT WAS MOVED BY MR. SHEARER SECOND~D BY MR. CHATT THAT ITEM 9 OF THE COMMITTEE 'RtpORT~E I <br />APPROVED. MOTION CARRIED. (BID AWARDED UNDER BID OPENING EARLIER IN MEETING.) 11 <br /> <br /> <br /> <br />! . <br /> <br />I <br />II <br />~I ,: <br />'\ ,: <br />1 I' <br />
The URL can be used to link to this page
Your browser does not support the video tag.