Laserfiche WebLink
<br />the proposed expansion area rather than the boundaries of the existing aggregate site <br />and shall not include the existing aggregate site. <br /> <br />The definition of "mining area" restricts the review of impacts to 1,500 feet from the boundary <br />of the area where mining is proposed to occur, unless factual information indicates that a <br />significant potential conflict from mining could occur with existing and approved uses beyond <br />that distance. We find that no credible factual information existing in the record to indicate or <br />demonstrate that analysis of a larger impact area is required for the proposed mining activity. <br />The applicant has analyzed all potential conflicts with mining of aggregate material on the <br />expansion area within an impact area extending 1,500 feet from the perimeter of the proposed <br />expansion area. The land uses of that impact area and the potential conflicts, with identified <br />mitigation measures, are discussed in the following sections. <br /> <br />The applicant has analyzed the potential conflicts with in an impact area extending 1500 feet <br />from the perimeter of the proposed expansion area. The City and County Planning Commissions <br />deliberated and considered whether or not the impact area extended beyond the 1500' minimum <br />as they considered each conflict 'type'. Both Planning Commissions found that none of the <br />conflicts extend beyond the 1500 ft. minimum impact area as measured from the perimeter of the <br />proposed expansion site. <br /> <br />The City Council agrees that the 1500 foot distance is sufficient to include the uses listed in - <br />180(5)(b). <br /> <br />(b) The local government shall determine existing or approved land uses within the <br />impact area that will be adversely affected by proposed mining operations and shall <br />specify the predicted conflicts. For purposes of this section, "approved land uses" are <br />dwellings allowed by a residential zone on existing platted lots and other uses for which <br />conditional or final approvals have been granted by the local government. For <br />determination of conflicts from proposed mining of a significant aggregate site, the <br />local government shall limit its consideration to the following: <br /> <br />Uses on land surrounding the proposed expansion area, and within the impact area, consist of <br />residential, agricultural and industrial uses. Residences are located south, west and north of the <br />proposed expansion area. The nearest residence (at the southern terminus of Admiral Street) is <br />located approximately 40 feet north of the boundary of the proposed expansion property. <br />Residential subdivisions at urban densities are approved and the dwellings are under construction <br />due west of the expansion site, inside the Eugene Urban Growth Boundary. The Urban Growth <br />Boundary is located in the stream/wetland that is the western border of the proposed expansion <br />site. A subdivision application for additional homes located immediately west of the expansion <br />site (Silver Meadows Second addition) is pending. A 15.4 acre vacant property owned by <br />Eugene School District 4J is located immediately north of the proposed expansion site. A single <br />agricultural field containing nursery tree stock is located within the impact area, northeast of the <br />proposed expansion area. The existing Delta Sand and Gravel Company facility is located <br />directly east of the proposed expansion area and the Eugene Sand and Gravel facility is located <br />further east across the Willamette River from the Delta Sand and Gravel Company property. <br /> <br />(A) Conflicts due to noise, dust, or other discharges with regard to those <br />existing and approved uses and associated activities (e.g., houses and schools) <br />that are sensitive to such discharges; <br /> <br />Exhibit A to Ordinance 20413 - 13 <br />